Shared from online news sources for reference and discussion; on April 26, Chamber A of the radiation section of Reactor No. 1 was installed
On April 27, Chamber B of the radiation section of Reactor No. 1 was installed
On April 28, Chamber A of the radiation section of Reactor No. 2 was installed
The project is located in a desert thousands of miles away, so it’s not possible to use modular factories for production. As can be seen from the diagram, a prefabrication plant must be built next to the site, where the components are manufactured and then lifted into place.
It’s equivalent to manufacturing on-site, with the factory responsible for material cutting and the assembly of some components
Yes, building a factory in Xinjiang presents transportation challenges; it’s not possible to carry out integrated manufacturing and assembly as is the case along the coast. However, the site is large enough
The project was completed in June 2021, with an estimated annual profit of 1.029 billion yuan. ------------------------------------------------------------------ It started construction last June, but it seems the completion will be delayed; it should still be possible by the end of the year
It can’t be finished; heavy snow falls in November. Around this time next year, I guess.
I’m also referring to next year. Additionally, this project is located in southern Xinjiang, where the climate conditions are better than those in northern Xinjiang. The temperatures are lower, but there is no heavy snowfall or extensive snow cover; therefore, construction can still take place during winter with appropriate measures