What are the characteristics and advantages of the framework agreement for the \"design-build-produce-operate and maintain\" integrated solution (EPC+O)?

2022-04-10View Original

Thread Content

What are the characteristics and advantages of the framework agreement for the \"design-build-produce-operate and maintain\" integrated solution (EPC+O)?
Reply #22022-04-10
There should be two contracting parties, just like a developer and a property management company; the property management company isn’t responsible for cleaning up the developer’s mess, so the developer can’t complain about what the property management company does.
Reply #32022-04-10
A developer and property management company; one can go ahead and provide the necessary proofs on their own
Reply #42022-04-10
When interests are involved, it’s not possible to be that selfless. Just like in the community where I live, despite the difficulties involved, we eventually got rid of the property manager who spoke in flowery terms; still, one has to choose the operator (property manager) themselves.
Reply #52022-04-10
1. Reduce costs, save on investments, shorten project timelines, and lessen financial pressure on contractors. For **the other party**, the EPC+O model offers a faster process, less supervision, greater flexibility; settlements remain within the budget, and the budget does not exceed the initial estimates. It is suitable for projects that require quick completion within tight deadlines. For contractors, such projects have short project cycles; there is no need to consider capital investment or financing issues, and they do not place high demands on a company’s cash flow. It is worth noting that reducing costs and saving on investments involves managing the life-cycle costs of a project; this does not necessarily mean lowering the initial construction cost. By using high-quality equipment or advanced construction methods, the initial cost may be higher, but the subsequent operation and maintenance costs will be significantly reduced – it is not simply a matter of cutting costs in the traditional sense. 2. Leverage the synergies between different phases to achieve true full-life-cycle management. By integrating design, construction, and operation, EPC+O brings operational requirements into the design phase, allowing suggestions that can facilitate construction and save costs to reach the designers. This approach addresses the issues of disconnects between design and operation as well as between design and construction, strengthens the contractor’s responsibility as the main entity involved, and ensures that the contractor takes into account operational planning and revenue generation during both the design and construction stages. As a result, effective coordination among design, construction, and operation is achieved, enabling efficient management of the project throughout its entire life cycle
Reply #62022-04-10
It can address the issues of disconnect between design and operation, as well as between design and construction. It strengthens the primary responsibility of the contractor, ensuring that they take into account operational planning and revenue generation from the design and construction phases. This promotes effective integration among design, construction, and operation, thereby enabling efficient management throughout the entire life cycle of the project. Well said – the owner is only responsible for investment and operation
Reply #72022-04-10
In the EPC+O model, the operation and maintenance refers to maintenance during operation, not actual operation; it seems that using ‘s’ would be better
Reply #82022-04-11
The EPC+O model seems to have little to do with budgets and settlements; the contractor will not receive less than what they are entitled to, with the relevant cost provisions in the general contract being the key factor.
Reply #92022-04-11
Maintenance is m, operation is Operation.
Reply #102022-04-11
For **’s EPCO project, it is a double-edged sword. Case: A chemical complex undertook the EPCO project for a wastewater treatment plant in a certain industrial park; to this end, it established a water management company with the aim of entering the environmental water services market and making a significant impact there. According to the data provided by the park, the project was designed to handle 200,000 cubic meters of wastewater per day. The project was quickly built and put into operation, yet it suffered losses for three consecutive years. **The design institute is criticized for poor management, while the water utility blames inadequate park management (corporate illegal discharges) and the issuing of empty checks, resulting in an inability to meet the treatment capacity requirements. The operating rights were ultimately transferred.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.