HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Major Equipment in the Chemical Engineering Sector】275 – 15,147-ton generator set modules for the Arctic 2 liquefied natural gas project manufactured in Tianjin

2022-05-24View Original

Thread Content

This post was last edited by Desert Fish on 2022-5-24 16:17: Red May for Chemical Workers! Reply reward! ---------------------------------------------- The past decade has been a period of rapid development for China’s chemical industry, marked by the emergence of many new processes, products, and equipment. There has also been significant progress in China’s chemical processing equipment, which has contributed to the swift advancement of the petrochemical sector. Here, we have compiled some of the achievements and breakthroughs made by Chinese equipment manufacturers in terms of larger-scale production and localization of such equipment. We invite everyone to share their insights and discuss these topics together, to cheer for Made in China and to support the development of chemical processing equipment! =====================
Reply #22022-05-24
Tianjin, December 15 (Wang Junyan, Peng Xiaoyi, Xing Xiao) – Reporters learned from Tianjin Customs that on the 15th, under the supervision of Tianjin Lingang Customs, the generator set modules for the Arctic 2 liquefied natural gas project were successfully transported out of Tianjin via Terminal 2 at Tianjin Lingang BOMCO. These are the third batch of modules delivered by Tianjin BOMCO Marine Engineering Co., Ltd., and they represent the largest and heaviest modules for this project. It is understood that the Arctic 2 liquefied natural gas project is located on the Gydan Peninsula in Russia. It represents the second large-scale liquefied natural gas project developed by Russian company Novatek in the remote polar region, following the Yamal liquefied natural gas project. Once completed, its annual production capacity will be 19.8 million tons, with an estimated 80% of that output intended for the Asia-Pacific market. Tianjin Bomeike Marine Engineering Co., Ltd. has been awarded the contract to construct the public and process facility modules for the 3 LNG liquefaction production lines in this project, with a total volume of over 100,000 tons. The total value of the contract is approximately 6.4 billion yuan, and it covers various tasks such as design, procurement, construction, and commissioning.
Reply #32022-05-24
Chinese manufacturing of core equipment drives rapid industrial development
Reply #42022-05-24
@RedLee_ZZHI @Shutong @ZhizheMing @Jiuguan @The Majestic Ultraman. @Extend Yan’an
Reply #52022-05-24
There is no need to install the units on-site anymore
Reply #62022-05-24
Finland and Switzerland are in a tough spot; currently, it’s impossible to rent LING ships at high prices.:lol
Reply #72022-05-24
The LNG from Arctic One is mainly supplied to East Asia
Reply #82022-05-24
Cheer for Made in China, give support to chemical equipment!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.