Thread Content
Jixian Wind-Hydrogen Storage and Alcohol Integration (Chemical Industry Sector) Project: This project is located in Jixian County, Shuangyashan City, Heilongjiang Province, and was invested in and constructed by Shuangyashan Hongzhan Biotechnology Co., Ltd. The project mainly involves the construction of a 130,000-ton green methanol production facility along with its supporting facilities, with a total planned land area of approximately 254,400 square meters. This project uses hydrogen produced by water electrolysis and carbon dioxide from fermentation as raw materials to produce green methanol on a scale of 130,000 tons per year. The main process equipment for this project includes carbon dioxide compression and purification, hydrogen production via water electrolysis, hydrogen storage and compression units, methanol synthesis and distillation units, as well as the auxiliary equipment required to support these units. The project investment amount is 2,310,764,000 yuan.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2660 to 2025, self-developed 10-kilowatt oscillating water column wave energy generation device “Dongbo-1” has reached a leading level in China. https://bbs.hcbbs.com/thread-5700863-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2660 to 2025, self-developed 10-kilowatt oscillating water column wave energy generation device “Dongbo-1” has reached a leading level in China. https://bbs.hcbbs.com/thread-5700863-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Frontiers of HaiChuan Chemical Technology】Amazing! The Dalian Institute of Chemical Physics has made significant progress in the field of photocatalytic hydrogen cleavage, achieving hydrogen cleavage at room temperature. https://bbs.hcbbs.com/thread-5700909-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】China Petrochemical’s first domestically produced Safety Instrumented System (SIS) was successfully tested and approved in Hangzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5700967-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs have been achieved in the pre-oxidation technology for the carbon fiber industry between 2026 and 2025; China’s first pilot-scale pre-oxidation furnace utilizing a combination of hot air and microwave technologies with a width of 0.4 meters has been developed. https://bbs.hcbbs.com/thread-5701002-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2668-2025: China’s first mobile energy storage power system was successfully applied on a drilling platform operated by Great Wall Drilling https://bbs.hcbbs.com/thread-5701137-1-1.html (Source: Haichuan Chemical Industry Forum)
【History of Haichuan Chemical】The crude oil pretreatment and catalytic cracking units at Yangzhou Petrochemical, which had been in operation for 32 years, were officially shut down and dismantled https://bbs.hcbbs.com/thread-5700372-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2679 to 2025: Development of the world’s first DN700 rotameter, breaking the monopoly on high-end flow meters. https://bbs.hcbbs.com/thread-5701235-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】From 2681 to 2025: China successfully installed 1.8 million tons per year of ethylene plant cracking gas compressors developed domestically https://bbs.hcbbs.com/thread-5701251-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in China’s low-temperature coal carbonization technology from 2016 to 2025 https://bbs.hcbbs.com/thread-5700695-1-1.html (Source: Haichuan Chemical Industry Forum)