HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Announcement on the Winner of the Bid for the Phase 1 Project of Zhongke Nengyuan Chemical (Gansu) Co., Ltd.’s 100,000-ton-per-year Green Methanol Production Facility

2025-09-09View Original

Thread Content

On September 8, the result announcement for the bid won for the first phase of the 100,000-ton-per-year green methanol production project of Zhongke Nengyuan Chemical (Gansu) Co., Ltd. was released. First-ranked bidder: China National Second Construction Engineering Co., Ltd. On July 16, the tender announcement for the first phase of the 100,000-ton annual green methanol production project of Zhongke Nengyuan Chemistry (Gansu) Co., Ltd. was released. The scope of the tender includes: (1) a hydrogen production plant with an annual output of 13,500 tons through electrolysis of water, along with accompanying hydrogen storage equipment and oxygen storage equipment ; (2) A biomass gasification plant with an annual processing capacity of 150,000 tons, including biomass gasification, gas purification, purification, and shift units ; (3) Annual production capacity of 100,000 tons (60,000 tons in Phase 1 and 40,000 tons in Phase 2) for green methanol synthesis, distillation, and storage facilities ; (4) Explosion-proof, lightning protection, anti-static, and fire-fighting facilities ; (5) 5,000 square meters of office buildings, laboratories, duty rooms, and other production support facilities. On August 19, the first public notice regarding the environmental impact assessment for the 100,000-ton-per-year green methanol production project of Zhongke Chemical Green Energy Development (Gansu) Co., Ltd. was released. Basic Information of the Project: Project Name: Annual Production Project of 100,000 Tons of Green Methanol. Nature of Construction: New construction. Constructor: Zhongke Chemical Green Energy Development (Gansu) Co., Ltd. Project Investment: The total investment for this project is 1,050 million yuan. Location of Construction: Minle Industrial Park, Gansu. Scope of Construction: A project for producing 100,000 tons of green methanol per year (including the processes of water electrolysis for hydrogen production and the synthesis of green methanol), as well as storage systems, loading stations, and associated utility facilities and auxiliary equipment. Zhongke Nengyuan Chemistry (Gansu) Co., Ltd. (formerly known as Zhongke Chemistry Green Energy Development (Gansu) Co., Ltd.) was established in 2025 and is located in Zhangye City, Gansu Province. It is a company that focuses on the promotion and application of scientific and technological solutions. The registered capital of the company is 20 million RMB. The shareholders of Zhongke Nengyuan include Beijing Xingnengyuanju Technology Co., Ltd., Zhongke Huahydrogen (Hubei) Technology Co., Ltd., and Minle County Jindi Ecological Agriculture Technology Development Co., Ltd. On August 1, an announcement was released regarding the results of the energy-saving assessment and capacity replacement process for China Energy’s annual production project of 100,000 tons of green methanol; the supplier selected was Gansu Android Engineering Technology Co., Ltd. On July 28, the results of the environmental impact assessment for China Energy’s project to produce 100,000 tons of green methanol per year were announced; the supplier selected was Gansu Andro Engineering Technology Co., Ltd.
Reply #22025-09-09
【Frontiers of HaiChuan Chemical Technology】Amazing! The Dalian Institute of Chemical Physics has made significant progress in the field of photocatalytic hydrogen cleavage, achieving hydrogen cleavage at room temperature. https://bbs.hcbbs.com/thread-5700909-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-09-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2653–2025: Completion of the First Pipeline Laying in China’s Largest Middle East Pipeline Project to Date https://bbs.hcbbs.com/thread-5700633-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-09-12
【History of Haichuan Chemical】Permanent shutdown of the facilities at Huayi Group’s Shanghai Nenghua Wujing plant https://bbs.hcbbs.com/thread-5701106-1-1.html (Source: Haichuan Chemical Forum)
Reply #52025-09-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2668-2025: China’s first mobile energy storage power system was successfully applied on a drilling platform operated by Great Wall Drilling https://bbs.hcbbs.com/thread-5701137-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-09-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2679 to 2025: Development of the world’s first DN700 rotameter, breaking the monopoly on high-end flow meters. https://bbs.hcbbs.com/thread-5701235-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-09-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful hydrogen production from gas field produced water from 2680 to 2025; the application areas of Dongfu Research Institute’s seawater hydrogen production technology continue to expand. https://bbs.hcbbs.com/thread-5701249-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-09-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in China’s low-temperature coal carbonization technology from 2016 to 2025 https://bbs.hcbbs.com/thread-5700695-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-09-16
【Ten Years of Rapid Development in Chemical Processing Equipment】2683-2025: SHENGU’s First Low-Temperature Ethylene BOG Reciprocating Compressor Completes Ultra-Low Temperature Load Testing https://bbs.hcbbs.com/thread-5701341-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-09-17
【Ten Years of Rapid Development in Chemical Equipment】2684-2025: New green synthesis technology for 1,3-butanediol approved in Yulin, Shaanxi https://bbs.hcbbs.com/thread-5701402-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-09-17
【Ten Years of Rapid Development in Chemical Equipment】Self-developed from 2657 to 2025! CNPC’s 100-kilowatt-class large-temperature-difference transcritical carbon dioxide air-source heat pump units put into operation https://bbs.hcbbs.com/thread-5700807-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.