HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Jiangxi Fuli New Energy’s new energy project with an annual output of 50,000 tons of lithium hexafluorophosphate (Phase II)

2025-11-19View Original

Thread Content

Recently, the Jingdezhen Municipal Ecological Environment Bureau made an approval decision and announced the environmental impact report of Jiangxi Fuli New Energy Materials Technology Co., Ltd.'s 50,000-ton-per-year lithium hexafluorophosphate new energy project (Phase II). The relevant information about the project is as follows: Project name: Lithium hexafluorophosphate new energy project with an annual output of 50,000 tons (Phase II) ; construction unit: Jiangxi Fuli New Energy Materials Technology Co., Ltd. ; construction site: In Tashan Industrial Park, Leping Industrial Park, Jiangxi ; Project investment: 1.2 billion yuan ; Project nature: Renovation and expansion ; Construction scale and content: 1. Use purchased yellow phosphorus and liquid chlorine as raw materials, and obtain phosphorus trichloride through processes such as melting, chlorination, and distillation. ; 2. Use self-produced phosphorus trichloride and purchased liquid chlorine as raw materials, and obtain phosphorus pentachloride through chlorination and other processes. ; 3. Using self-produced phosphorus pentachloride and purchased hydrofluoric acid, concentrated sulfuric acid, and lithium fluoride as the main raw materials, the product lithium hexafluorophosphate is obtained through fluorination, preparation, synthesis, concentration, centrifugation, hydrolysis, and drying. After the project is completed, the production scale will be: Phosphorus pentachloride 20,000t/a, lithium hexafluorophosphate 20,000t/a, by-products ordinary hydrochloric acid 28,875.05t/a, electronic grade hydrochloric acid 56,000t/a.
Reply #22025-11-19
[Everyone talks about Haichuan safety] Summary post of hidden dangers around you - with pictures and texts, everyone is welcome to participate in the discussion https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: Haichuan Chemical Forum)
Reply #32025-11-19
[Ten years of development of chemical equipment] 2830-2025 The world's first "sea and land integrated" flexible DC transmission project has successfully assembled the DC converter transformer https://bbs.hcbbs.com/thread-5705493-1-1.html (Source: Haichuan Chemical Forum)
Reply #42025-11-19
[Ten years of development of chemical equipment] Important breakthroughs from 2831 to 2025! Domestic high-end polyolefin elastomer pilot technology passes scientific and technological achievement appraisal https://bbs.hcbbs.com/thread-5705551-1-1.html (Source: Haichuan Chemical Forum)
Reply #52025-11-20
[Ten years of development of chemical equipment] 2833-2025 is amazing! Nanjing Engineering's new construction technology of spherical storage tanks based on all-position automatic welding has launched large-scale application in Maoming Petrochemical https://bbs.hcbbs.com/thread-5705632-1-1.html (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #62025-11-20
[Frequently Asked Questions in Haichuan Pipeline Design] Summary post, pictures and texts are being updated, welcome to participate in the discussion https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #72025-11-21
[Ten years of development of chemical equipment] 2834-2025 pipeline intelligent welding robot officially put into use https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #82025-11-21
[Ten years of development of chemical equipment] 2834-2025 pipeline all-position intelligent welding robot is officially put into use https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #92025-11-21
[Ten years of development of chemical equipment] 2844-2025 my country's first high-pressure natural gas long-distance pipeline residual pressure power generation project - Haimen Station natural gas residual pressure power generation project was officially put into operation in Nantong, Jiangsu https://bbs.hcbbs.com/thread-5706004-1-1.html (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #102025-11-22
[Ten years of development of chemical equipment] 2838-2025 Lanshi Group independently developed the first 90MPa ionic liquid hydrogen compressor in China and completed the 90MPa hydrogen cycle pressurization test https://bbs.hcbbs.com/thread-5705737-1-1.html (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.