Thread Content
Project Name: Sichuan Jinyuansheng New Energy Materials Co., Ltd.’s Project to Produce 100,000 tons of special ferric phosphate and 100,000 tons of special lithium iron phosphate per year. Launch Date: November 18, 2025. Location: Sichuan Province. Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Chemical Raw Materials. Project Owner: Sichuan Jinyuansheng New Energy Materials Co., Ltd. Total Investment: 423 million yuan. Current Progress: Environmental impact assessment under public review. Construction Location: Ganmei Industrial Park, Xiuwen Town, Dongpo District, Meishan City, Sichuan Province. Scope of Construction: Ferric phosphate will be produced using the iron powder process, while lithium iron phosphate will be manufactured through a high-temperature solid-state process. A flexible production line for ferric phosphate/lithium iron phosphate will be established. The project will be built in two phases; in the first phase, two such flexible production lines will be constructed, with each line capable of producing 5,000 tons of lithium iron phosphate per year as well as 5,000 tons of ferric phosphate per year. Upon completion, the facility will have a flexible production capacity of 10,000 tons per year of ferric phosphate/lithium iron phosphate; Phase 2 involves the construction of 9 flexible production lines for iron phosphate/lithium iron phosphate; each line is capable of producing 10,000 tons of lithium iron phosphate per year, as well as 10,000 tons of iron phosphate per year, thereby creating a flexible manufacturing capacity of 90,000 tons per year for iron phosphate/lithium iron phosphate. Progress milestone: On November 13, 2025, Sichuan Jinyuansheng New Energy Materials Co., Ltd. published a draft for public comment regarding its project to produce 100,000 tons of special ferric phosphate per year, as well as a project to produce 100,000 tons of special lithium iron phosphate per year (Phase 1) – this was part of the environmental impact assessment process. On September 29, 2025, the project was officially registered. (Project registration). . . . . . . . . . . . . . . . .
【Ten Years of Rapid Development in Chemical Equipment】2846-2025: The first domestically produced million-ton-class methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2840-2025: Maoming Gravity Manufacturing and CNPC’s independently developed first set of modular polypropylene loop reactor systems https://bbs.hcbbs.com/thread-5705786-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Systems’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Systems’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest seamless steel pipe production line, 2843-2025, was officially put into operation at Shandong Guangfu Group. https://bbs.hcbbs.com/thread-5705991-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2844-2025: China’s first project for generating electricity from the residual pressure of high-pressure natural gas transmission pipelines – the Haimen Station natural gas residual pressure power generation project – has been put into operation in Nantong, Jiangsu. https://bbs.hcbbs.com/thread-5706004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made desalination modules for European methanol projects were officially delivered and shipped, 2029–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】SINOPEC’s Research Institute of Petrochemistry’s high-efficiency catalytic cracking (RTC) technology was tested and validated at Zhenhai Refining & Chemical Complex from 2023 to 2025. https://bbs.hcbbs.com/thread-5705591-1-1.html (Source: Haichuan Chemical Forum (HCBBS))