Lifting of 10 blending silos for the 400,000-ton polypropylene unit in Inner Mongolia Rongxin Chemical’s 800,000-ton olefin project

2025-12-02View Original

Thread Content

On November 30, after three days of continuous efforts, all 10 mixing silos (32300-D-0901A-J) for the 400,000-ton/year polypropylene unit of the 800,000-ton/year olefin production project at Inner Mongolia Rongxin Chemical Co., Ltd., which was under EPC general contracting by a consortium formed by the company and Daqing Petrochemical Engineering Co., Ltd., were successfully installed. This marks the official entry of the project into the equipment installation phase, laying a solid foundation for the subsequent work such as the installation of process pipelines and electrical instruments. It is reported that each of the 10 blending silos to be lifted this time is 28 meters high, 8 meters in diameter, and weighs 30 tons; the elevation of the foundation supports on which they will be placed is 16.4 meters, and the lifting range required is 30 meters. In the face of the challenges posed by the large size of the equipment and stringent requirements for operational parameters, the Party branch of the project department has consistently integrated Party building into the entire process of construction and production, providing strong political support for overcoming the difficulties associated with the project. The party branch established a technical task force led by party members and cadres, which conducted repeated evaluations and optimizations through various methods such as 3D simulations and on-site surveys. Ultimately, the \"double-crane lifting and delivery method\" was adopted – a system in which a 500-ton truck crane serves as the main crane while an 80-ton truck crane acts as the auxiliary crane. This approach overcame the technical challenges posed by limited space and insufficient site conditions, providing a solid guarantee for the safe and precise placement of the equipment. To ensure the safe and efficient progress of the lifting operations, the project team took the initiative to work together with the client, the silo manufacturer, and the supervision agency to hold specialized seminars. Multiple rounds of review and optimization were carried out regarding the planning of equipment transportation routes and the design of lifting procedures, with responsibilities assigned at each stage and measures refined accordingly. Party members and cadres took the initiative to take charge of the operations, coordinating the resolution of various obstacles that arose during the transportation of equipment. They organized the replacement of the soil in the site where lifting operations would take place and conducted special tests to assess its load-bearing capacity, thereby establishing a solid safety framework to ensure the smooth progress of the lifting work. During the lifting process, the project team focused on precise control throughout the entire procedure. A real-time monitoring system was installed at the work site to dynamically monitor key aspects such as the lifting posture of the equipment, the stress on the lifting points, and its real-time movement trajectory, thereby eliminating safety risks such as deviation and tilting at their source. The personnel in various roles, including the ground command team, the aerial operation team, and the lifting operation team, have clear responsibilities and work together in coordination. By using standardized command signals and real-time communication via walkie-talkies, they ensure smooth information flow, thereby establishing a working system characterized by party members taking the lead, close cooperation between staff and the public, and efficient coordination – all of which provide comprehensive support for the safe and smooth progress of lifting operations.
Reply #22025-12-02
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-12-04
【Ten Years of Rapid Development in Chemical Engineering Equipment】The submarine pipeline stability analysis software developed independently by CNOOC Engineering, 2862-2025, has obtained certification from the China Classification Society, filling a gap in this field. https://bbs.hcbbs.com/thread-5706988-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #42025-12-05
【Ten Years of Rapid Development in Chemical Equipment】After 13 years of development, 2863-2025 was successfully developed, breaking foreign monopolies! Successful trial production of 17-meter ultra-long ultra-high-pressure steel pipes in our country https://bbs.hcbbs.com/thread-5706989-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52025-12-06
【Ten Years of Rapid Development in Chemical Equipment】2865-2025: Turning Waste into Treasure! Shenzhen Institute’s 100-kilowatt oil and gas wastewater hydrogen production system turns wastewater into green hydrogen https://bbs.hcbbs.com/thread-5707067-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-06
【Sea and River Safety Discussion】Hidden Dangers Around Us – How many pressure gauges lack the red lines marked on their dials as required? ? https://bbs.hcbbs.com/thread-5707432-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72025-12-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2867 to 2025, CNOOC Engineering took the lead in developing a device for detecting the flare angle of cable-laying machines, which has been successfully put into use. https://bbs.hcbbs.com/thread-5707082-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.