The air separation unit of the Tarim Phase II ethylene project produces qualified nitrogen

2026-01-19View Original

Thread Content

On January 14, Unit 2 of the air separation unit in the Tarim 1.2 million tons/year Phase II ethylene project, constructed by China Kunlun Engineering Dalian Branch, successfully produced nitrogen of qualified purity, with an O2 content of ≤3 ppm, marking a significant breakthrough at a key stage of this facility. To ensure the project’s timely commissioning, the project team at the Dalian branch worked overtime for 24 consecutive hours, successfully completing the filling of the pearlescent sand in container #2 and thus laying a solid foundation for the project’s operation. Millimeter-level precision creates “heart engineering”. As the \"gas supply center\" for the ethylene project, the air separation unit relies on its core equipment, namely the cryogenic tank, to carry out the distillation and separation of oxygen and nitrogen. Each of the 1# and 2# cold boxes is composed of 4 sets of jacks; the jack for the main tower cold box weighs 125 tons, that for the main heat exchanger cold box weighs 90 tons, that for the auxiliary tower cold box weighs 65 tons, and that for the oxygen tower cold box weighs 18 tons. These jacks are large in size and have a high center of gravity; their installation requires extremely high precision, with horizontal deviations having to be kept within the millimeter range. Any minor error can affect the operational efficiency of the entire system. To ensure the accurate positioning of the cold box, the project team initiated comprehensive preparatory work one month in advance. From the repeated reviews of the lifting plan to the reinforcement of the equipment foundations, from the careful selection of lifting gear to the continuous monitoring of weather conditions, every aspect has been carefully considered and optimized multiple times to ensure absolute reliability. During the lifting process, a \"double-crane lifting\" technique is employed; the 400-ton crawler crane takes on the main lifting load to ensure that the container is raised vertically and smoothly ; The auxiliary crane uses a 160-ton hydraulic truck crane; by working in precise coordination with the main crane, it adjusts the posture of the equipment dynamically, thereby effectively counteracting disturbances such as wind forces and uneven gravity. 24 hours of continuous effort demonstrate the commitment between family and enterprise. During the pearlescent sand filling phase, all members of the project team demonstrated the petroleum spirit of \"daring to take on tough challenges and being capable of winning battles\" by working overtime for 24 consecutive hours. “Pearl sand filling is a critical process with high technical requirements and intense workload, demanding strict control over the filling density and uniformity. ”As introduced by Wang Jingtao, the project manager of the Dalian branch. The construction workers overcame unfavorable factors such as winter construction and dusty weather, and strictly followed the operating procedures by using wooden hammers to strike the outer shell of the cold box repeatedly, ensuring that the pearlescent sand was filled tightly and thus providing a reliable guarantee for the cold-insulating performance of the cold box. The Dalian branch has always focused on fostering a corporate culture centered on a sense of belonging to the family and the company, promoting the cultural values of integrity, innovation, service, and mutual success. In this critical battle, the Party member commando team and the youth commando team of the project department took the lead, planting the Party flag and the commando team flags at the construction site, thereby playing a exemplary role and demonstrating the team spirit of the Kunlun Project workers – working together as one family with one heart and one goal.
Reply #22026-01-19
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2035, the first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #32026-01-20
【Ten Years of Rapid Development in Chemical Equipment】2978–2026: China’s First “Lighthouse Factory” in the Global Fiber Industry Established by Huafeng Chongqing Spandex https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #42026-01-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))
Reply #52026-01-20
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #62026-01-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))
Reply #72026-01-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.