Correction Announcement for the EPC General Contracting of the 100,000 tons/year Biomass Green Methanol Project (Phase I) in Lanzhou New Area

2026-01-19View Original

Thread Content

On January 16, a correction announcement was issued regarding the EPC general contracting for the 100,000 tons per year biomass-based green methanol project (Phase I) in Lanzhou New Area. Construction location: To the east of Chemical Economic Road 3, to the south of Chemical Latitude Road 3, and to the north of Chemical Latitude Branch Road 4 in the chemical industrial park. Construction scale and scope: Lanzhou New Area 100,000 tons/year biomass green methanol project (Phase I). Total investment: 1,427,398.7 thousand yuan. Timeline requirement: March 2026 to September 2027, not exceeding 18 months (including the construction period during the winter and rainy seasons). Bid section division: Bid Section 1: The design, procurement, and general construction contract for one set of biomass gasification units, as well as for the processes of conversion and purification, compression, methanol synthesis, and methanol distillation, along with utility and auxiliary facilities for the 100,000 tons per year biomass-based green methanol project (Phase I) in Lanzhou New Area. These facilities include gas-fired boilers for power generation, systems for preparing biomass pellets, storage areas for biomass raw materials, tank farms and loading/unloading systems, flares, the entire plant’s piping system, air separation units, circulating water stations, production fire protection systems, sewage pretreatment facilities, deoxygenation stations, desalination stations, initial rainwater collection tanks/accident storage tanks, the entire plant’s water supply and drainage systems, 35kV substations, power distribution stations, electrical and telecommunications systems, lighting systems, a control room, office buildings, comprehensive buildings, a central laboratory, temporary storage areas for hazardous waste, spare parts storage areas, fences, gates, factory roads, and fire protection systems. Bid Section 2: General contract for the design, procurement, and construction of a backup biomass gasification unit for the 100,000 tons per year biomass-based green methanol project (Phase I) in Lanzhou New Area
Reply #22026-01-19
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-01-19
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2035, the first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #42026-01-19
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-01-20
【Ten Years of Rapid Development in Chemical Equipment】2978-2026: The first “Lighthouse Factory” in the global fiber industry is established by Huafeng Chongqing Spandex https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-01-20
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hachuan Chemical Industry Forum (HCBBS))
Reply #72026-01-20
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82026-01-21
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hachuan Chemical Industry Forum (HCBBS))
Reply #92026-01-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982–2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first pressure relief device for flow meters in sulfur-containing gas fields in China was put into use from 2027 to 2026. https://bbs.hcbbs.com/thread-5711107-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.