The first installation attempt of 147 large-scale equipment units for Phase II of Shaanxi Coal Yulin Chemical was a success!

2026-01-28View Original

Thread Content

At 9:17 a.m. on January 26, the low-pressure tower for the methanol distillation unit of Phase 1 of the second phase of the Shaanxi Coal Yulin Chemical project – a structure 64.9 meters tall, with a diameter of 5 meters and a lifting weight of 285.14 tons – was lifted into place by Shaanxi Huajian Lifting Company. This tower is the first large-scale equipment in the methanol distillation plant, marking the beginning of the installation of subsequent large-scale components. For this lifting operation, an 800-ton crawler crane was used as the main crane, while a 260-ton crawler crane was responsible for assisting with the movement of the load. The space at the methanol distillation plant is limited, so precise control is required for all lifting, moving, and positioning tasks – no mistakes are allowed. To overcome these challenges, the lifting team adhered to the principle of \"planning early, preparing early, and acting early,\" carefully planning and meticulously implementing every detail of the construction process. By making thorough preparations to address various risks, they ensured that the lifting tasks were carried out safely and in an orderly manner. Meanwhile, the other 4 columns to be installed in the methanol distillation unit before the Spring Festival are also in full swing with on-site \"floor welding and outfitting\" work. The critical phase coincided with the arrival of a cold wave, and the low temperatures posed significant challenges to the welding quality of the equipment, the toughness of the steel, and the construction efficiency. To address this issue, it is necessary to first check whether the gas cylinder nozzle is blocked or frozen before welding, to ensure the smooth and stable supply of protective gas ; Secondly, preheating is carried out on the weld area ; Before use, the flux is baked as specified to ensure its moisture content remains below 0.1%, thereby creating favorable conditions for subsequent lifting. It is reported that the lifting company is responsible for lifting 147 large-scale pieces of equipment in Section 2 of this project, with a total lifting weight of approximately 31,341.4 tons; the total weight of the equipment that exceeds size limits is 9,898.62 tons. The completion of this first lifting task not only marks the beginning of the lifting operations for the remaining large-scale equipment in the methanol plant, but also signifies that the project construction at this stage has shifted from civil engineering work to installation work.
Reply #22026-01-28
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-01-28
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-01-28
【Ten Years of Rapid Development in Chemical Equipment】First domestic Type IV hydrogen tube bundle container was successfully produced from 2992 to 2026 https://bbs.hcbbs.com/thread-5712323-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52026-01-28
The 【Haichuan Equipment Guessing】 series will continue to be updated in 2027 – all Haiyu friends are welcome to participate actively! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-01-29
【Ten Years of Rapid Development in Chemical Equipment】Successful first trial run of the high-pressure carbon dioxide compressor for CCS units at Shaanxi Gas Group from 2023 to 2026 https://bbs.hcbbs.com/thread-5712362-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-01-29
【Ten Years of Rapid Development in Chemical Equipment】Successful first trial run of the high-pressure carbon dioxide compressor for CCS units at Shaanxi Gas Group from 2023 to 2026 https://bbs.hcbbs.com/thread-5712362-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-01-29
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92026-01-30
【Ten Years of Rapid Development in Chemical Equipment】2996-2026 – Amazing! ! The CNPC First Construction Team completed the welding of the first weld on the diagnostic shielding module for the International Thermonuclear Fusion Experimental Reactor ITER project. https://bbs.hcbbs.com/thread-5712416-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-01-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2997 to 2026: Domestic high-performance carbon fiber ZA55GC enters the core supply chain of domestic commercial aircraft https://bbs.hcbbs.com/thread-5712466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2997 to 2026: Domestic high-performance carbon fiber ZA55GC enters the core supply chain of domestic commercial aircraft https://bbs.hcbbs.com/thread-5712466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.