On the 26th of the month, the approval was granted for the changes to the integrated project for producing ammonia and alcohol from green hydrogen in Dolun County, Xilingol League. The project is located in the Economic Development Zone of Dolun County, Xilin Gol League, Inner Mongolia. The entity responsible for the project is Inner Mongolia Gemeng Nuojin Hydrogen Energy Technology Co., Ltd., with a total investment of 1,090,000 million yuan. Construction scale and content: The main focus is on building a hydrogen production facility with an annual capacity of 131,700 tons; this facility will be used to produce 696,000 tons of synthetic ammonia and 176,700 tons of methanol per year, using green hydrogen. The project will be constructed in phases: Phase 1 will involve the production of 62,200 tons per year of green hydrogen and 348,000 tons per year of synthetic ammonia. It will include 148 alkaline electrolyzers with a capacity of 1,000 Nm³/h each, as well as 72 PEM electrolyzers with a capacity of 250 Nm³/h each. Additional facilities include a comprehensive office building, hydrogen filling stations, desalination plants, gas boilers, plant-wide flares, a 220 kV main substation, 110 kV substations along with related power distribution equipment, purification stations, circulating water systems, wastewater treatment plants, general warehouses, maintenance workshops, hydrogen production units using electrolysis, green ammonia production units, air separation units, and chemical storage areas. In the second phase of construction, the facility will have an annual production capacity of 69,500 tons of green hydrogen, 348,000 tons of synthetic ammonia, and 176,700 tons of methanol. It will be equipped with 160 alkaline electrolyzers with a capacity of 1,000 Nm³/h, 80 PEM electrolyzers with a capacity of 250 Nm³/h, as well as 2 gasification furnaces and other auxiliary facilities. Additionally, there will be a 220 kV main substation along with related power distribution equipment, a hydrogen filling station, steam turbine generators, water electrolysis units for hydrogen production, biomass gasification units, green methanol production units, green ammonia production units, and air separation units. The project construction period has been changed to June 30, 2026, to June 29, 2028
【Ten Years of Rapid Development in Chemical Equipment】2996-2026 – Amazing! ! The CNPC First Construction Team completed the welding of the first weld on the diagnostic shielding module for the International Thermonuclear Fusion Experimental Reactor ITER project. https://bbs.hcbbs.com/thread-5712416-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2997 to 2026: Domestic high-performance carbon fiber ZA55GC enters the core supply chain of domestic large aircraft https://bbs.hcbbs.com/thread-5712466-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2999–2026: Lunan Chemical’s world’s first 3,000-ton OMB coal gasification furnace has been operating continuously, safely and stably for over 350 days https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712515 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711445 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2026 to 2036, Tianhua Institute successfully designed and manufactured the world’s first set of horizontal polyconders for nylon 66; the 100,000-ton/year nylon 66 production facility at Liaoyang Petrochemical was brought online successfully in just one attempt. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712094 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first domestically produced helium ionization chromatograph, 2973-2025, has been officially delivered to the high-end polyolefin project at Blue Ocean New Materials. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711129 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Inconsistent Installation Directions of Pipe Bolts and Excessively Long Exposure Length of the Bolts https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711719 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The Tianjin Bohua Safety Organic Liquid Hydrogen Storage and Handling Demonstration Project, 2970–2025, has been successfully put into operation. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711046 (Source: Haichuan Chemical Industry Forum (HCBBS))