Completion of lifting 3 large-scale units for the low-temperature methanol washing unit of the 1,600-ton crawler crane in the Shanxi broccoli project

2026-03-20View Original

Thread Content

Recently, at the site of the low-temperature methanol washing unit in the Shanxi cauliflower coal chemical industry energy-saving and environmental protection upgrade project, the upper section of the shift gas washing tower (C-613001), with a diameter of 3.6 meters, a length of 30 meters, and a weight of 200 tons, was accurately installed in place. This lifting operation represents another precise use of the 1600-ton crawler crane, following the lifting of the lower section of the gas scrubber tower on March 11 (click to view the report: 1600-ton crawler crane used for lifting; the heaviest tower structure in the Shanxi Cauliflower Coal Chemical Project was successfully installed). At the lifting site, a 1,600-ton crawler crane used the sophisticated \"single-machine lifting and delivery method\" to steadily lift equipment weighing hundreds of tons into the air, placing it precisely at a height of 71 meters. This marks the successful completion of the heavy equipment lifting tasks for this facility; the 1600t crawler crane has fulfilled its role in lifting operations within the facility area. It is understood that the project was carried out efficiently over a period of one month, during which three super-large tower structures were lifted, with a total lifting weight of 1,400 tons. Faced with challenges such as tight deadlines, variable working conditions, and limited space, the construction team conducted multiple surveys in the early stages and collaborated with various parties to optimize the plans. By utilizing 1600t and 500t crawler cranes in conjunction with each other, they carried out efficient construction to overcome various obstacles, earning high recognition from the client for their hard work and efficiency. The Shanxi Broccoli Coal Chemical Industry Energy-Saving, Environmentally-Friendly Upgrade Project involves the renovation and expansion of an existing urea production facility, as well as a technical upgrade to achieve zero wastewater discharge. This project makes use of pressurized continuous gasification technology for coal/coal briquettes, with 5 new continuous gasifiers being installed in place of the 37 existing batch gasifiers; the total investment amounts to approximately 3.962 billion yuan. The completion of this project will effectively reduce energy consumption, lower emissions, and improve the ecological environment, thereby providing a green driving force for the high-quality development of the region.
Reply #22026-03-21
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2030 to 2026, China’s first ultra-large-diameter (nominal diameter of 2000 millimeters) axial flow check valve successfully passed its practical application tests. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715995 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32026-03-22
【Special Topic on Safety Facility Design】Discussion Summary Post: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714902 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42026-03-22
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haimen Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52026-03-24
【HaiChuan Equipment Guessing Game】==What a big ice cream! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716191 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-03-24
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial facility for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process was put into commission at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-03-25
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: A 15-year period! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into production. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #82026-03-27
【Ten Years of Rapid Development in Chemical Equipment】Key dehydrogenation technology for the toluene-methylcyclohexane organic liquid hydrogen storage system: Approved from 3051 to 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716272 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-03-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful pilot testing of Dongfang Electric’s natural gas-ammonia combustion technology from 2032 to 2026! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716290 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.