Thread Content
On the 31st of the month, the first public announcement was made regarding the environmental impact assessment for Yichang Shilei New Energy Technology Co., Ltd.’s project to produce 60,000 tons of lithium hexafluorophosphate per year. The details of the project are as follows: Project name: Yichang Shilei New Energy Technology Co., Ltd.’s project for an annual production capacity of 60,000 tons of lithium hexafluorophosphate ; Construction unit: Yichang Shilei New Energy Technology Co., Ltd ; Construction location: Yidu City, Yichang City, Hubei Province ; Project investment: The total registered investment for the project is 1,000 million yuan; Project type: New construction ; Construction contents: The project covers an area of 244 mu, and new synthesis workshops, electrolyte workshops, refining workshops, cleaning workshops, as well as supporting auxiliary production facilities will be built ; One set each of new lithium hexafluorophosphate (solid salt) production facilities and electrolyte production facilities, as well as acid and alkali tank systems, electrolyte storage tanks, etc., will be installed. The project is planned to be constructed in phases. Once Phase 1 is put into operation in 2027, it will be able to produce 30,000 tons of lithium hexafluorophosphate and 100,000 tons of electrolyte per year. Upon the completion of Phase 2 in 2028, the entire facility will be capable of producing 60,000 tons of lithium hexafluorophosphate and 200,000 tons of electrolyte per year. Regarding Yichang Shilei New Energy Technology Co., Ltd.: Established in January 2026, Yichang Shilei New Energy Technology Co., Ltd. has a registered capital of 100 million yuan. It is wholly owned by Jiangxi Shilei Fluorine Materials Co., Ltd., and is located in the Chemical Industry Park in Zhicheng Town, Yidu City, Yichang Province, Hubei Province. It is a high-tech enterprise focused on the research, development, production, and sales of new energy materials, specialty materials for electronics, and fluorine chemical products.
【Ten Years of Rapid Development in Chemical Equipment】China’s first 1.5t/h LNG cryogenic unit successfully passed its Factory Acceptance Test (FAT) between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716919 (Source: Haimen Chemical Industry Forum (HCBBS))
【Haichuan Equipment Guessing Game】What equipment is this being cleaned? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717350 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Equipment Guessing Game】A whole bunch of iron balls https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717129 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, SHENGU Group successfully developed the world’s first reciprocating compressor with an ultra-high thrust of 2000 kN! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717432 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】5MW hydrogen-based seawater hydrogen production equipment for China Huadian Group’s project has been delivered. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717496 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3075–2026: Successful Application of China Coal Research Institute Shanghai’s 0.9m cutting height coal mining machine with the highest installed power in the world https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717538 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: Haichuan Chemical Industry Forum (HCBBS))
【3D Process Flow】Summary Post–Xinjiang Zhundong’s 33.8-billion-yuan green hydrogen industry chain: the entire process from hydrogen production via wind and solar power to its use in chemical industries https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))