Thread Content
On April 7, the People’s Government of Gu County issued a draft for public comments on the environmental impact assessment for the second phase of the upgrade project for Shanxi Hongyuan New Energy Co., Ltd.’s coking facility with a capacity of 720,000 tons per year and carbonization chamber heights of 6.25 meters. The relevant details are announced as follows: I. Project Overview Project Name: Upgrade project for Shanxi Hongyuan New Energy Co., Ltd.’s coking facility with a capacity of 720,000 tons per year and carbonization chamber heights of 6.25 meters (Phase II) Location: Jianhe Chemical Industrial Park, Gu County, Linfen City, Shanxi Province Nature of the project: Technical upgrade Existing facilities: The first phase of the project utilizes 6.25-meter-high 3×65-hole 6253D type coke ovens, along with supporting systems such as coal preparation equipment, dry quenching equipment, chemical product recovery systems, as well as facilities for flue gas desulfurization and denitrification and advanced wastewater treatment and reuse systems. This setup enables a coking capacity of 2.16 million tons per year. Construction content: Add a coking-related washing and sorting workshop with a processing capacity of 1.8 million tons per year ; Add new coal storage and distribution facilities ; Add 1×65-hole 6.25m 6253D type ramming coke oven ; New gas purification units such as primary coolers, desulfurization towers, regeneration towers, and saturators have been added ; New ammonium sulfate production unit from desulfurization waste liquid ; Renovate and expand the existing biological wastewater treatment units ; A new set of environmental protection facilities, such as a reclaimed water reuse system, will be installed. Coke quenching, coke screening, the tank farm, waste gas treatment, and the water supply system all rely on the facilities already built in Phase 1. Project site: Construction will be carried out using the land reserved within the factory complex and the newly planned industrial land in the park. Total investment: 1,101,912,400 yuan, of which 121,750,000 yuan is invested in environmental protection, accounting for 11.05%.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Hachuan Chemical Industry Forum (HCHBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Installation Direction of the Flange Cover on the Drain Valve of Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717574 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【3D Process Flow】【3D Process Flow】Summary Post--Petroleum Refining Process Flow Diagram 16--Molecular Sieve Adsorption Refining Process Diagram https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717601 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: HaiChuan Chemical Industry Forum (HCBBS))
【3D Process Flow】Summary Post--Xinjiang Zhundong’s 33.8-billion-yuan green hydrogen industry chain: the entire process from hydrogen production via wind and solar power to its use in chemical industries https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3083-2026: SHENGU manufactures China’s first single-stage cantilever-type fully assembled centrifugal compressor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717804 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Successful One-Time Commissioning of Lianyungang’s World’s First Process for Converting Light Hydrocarbons into Ethylene Glycol, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (Hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China National Petroleum’s first megawatt-class PEM hydrogen production system passed the authoritative CNAS testing and certification https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717958 (Source: Haichuan Chemical Industry Forum (HCBBS))