The steel dome of the 120,000-cubic-meter low-temperature ethane storage tank, weighing 540 tons, was smoothly raised as part of the Sinopec Ethane Cracking Upgrade and Feedstock Structure Optimization project in Shanghai

2026-04-16View Original

Thread Content

At 10:20 on April 14, at the site of the Shanghai Sinopec Ethane Cracking Upgrade and Feedstock Structure Optimization project, which is under EPC general contracting by Ningbo Engineering Company, a steel dome with a diameter of 72 meters and a total weight of 540 tons was lifted smoothly under air pressure, and was placed precisely on top of the 120,000 cubic meter low-temperature ethane storage tank. The project includes 1 low-temperature ethane tank with a capacity of 120,000 cubic meters, 1 low-temperature LPG tank with a capacity of 50,000 cubic meters, 1 low-temperature ethylene tank with a capacity of 50,000 cubic meters, as well as supporting auxiliary systems. Once completed, it will help the Sinopec Ethylene Plant in Shanghai diversify its raw material sources, thereby improving quality and efficiency and accelerating transformation and upgrading on the new journey of promoting high-quality development through a second round of innovation. The lifting of the 540-ton dome this time used the \"pneumatic jacking\" method. The fan continuously supplies air into the sealed tank, and the overpressure generated inside the tank acts evenly on the bottom surface of the dome. When the upward force exceeds the weight of the structure plus the frictional resistance of the tank walls, the dome begins to rise steadily along the tank walls. The lifting speed is controlled to the millimeter level, the deviation angle is kept within a very small threshold; there is no need for correction throughout the process, and the task is completed in one go.
Reply #22026-04-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #32026-04-17
【Ten Years of Rapid Development in Chemical Processing Equipment】3074-2026: Filling a gap in China’s market; pilot production successful for catalysts with an ultra-low water-carbon ratio https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717537 (Source: Haichuan Chemical Forum (HCBBS))
Reply #42026-04-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-04-18
【Ten Years of Rapid Development in Chemical Engineering Equipment】The Haimang Hydrogen Energy Ningdong Organic Liquid Hydrogen Storage Material Base began trial production in 203088–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718001 (Source: Hachuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-04-18
【Haichuan Equipment Guessing Game】What is tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72026-04-18
【Ten Years of Rapid Development in Chemical Equipment】Successful One-Time Commissioning of Lianyungang’s World’s First Process for Converting Light Hydrocarbons into Ethylene Glycol, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-04-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】3087-2026: China’s first offshore mobile multi-functional platform, “Zengchan No.1”, was delivered https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718136 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-04-21
【In-depth Discussion on Modular Installation of Haichuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-04-22
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose station, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.