Thread Content
On May 6, the website of the Ningjin County People’s Government published a notice titled \"Public Notice Prior to Submission for Approval of the Environmental Impact Assessment Report for Hebei Zhonghao New Materials Technology Co., Ltd.’s 50,000 tons per year polyether polyol and 50,000 tons per year blended polyether polyol production projects.\" Project Overview (1) Project Name: 50,000 tons/year polyether polyol, 50,000 tons/year blended polyether polyol project. (2) Project owner: Hebei Zhonghao New Materials Technology Co., Ltd. (3) Location of construction: This project is located at No. 22, Weiyi Road, Salt Chemical Industry Park, Economic Development Zone, Ningjin County, Xingtai City, Hebei Province. (4) Nature of construction: New construction. (5) Construction contents: Construction of buildings such as a polyether polyol production workshop, a combined polyether polyol production workshop, a filling workshop, a Class A storage tank area, a Class C raw material storage tank area, warehouses, maintenance rooms, control rooms, laboratories, and office buildings, with a total construction area of 12,079 m2. Install equipment such as reaction vessels, condensers, receiving tanks, mixing vessels, vacuum buffer tanks, filters, refrigerators, air compressors, nitrogen generators, and storage tanks. Complementary environmental protection, fire protection, safety, and other facilities as well as related projects. (6) Construction scale and product plan: 50,000 tons per year of polyether polyol, and 50,000 tons per year of blended polyether polyol. (7) Project investment: The total investment in the project is 315 million yuan, of which 1.2 million yuan is allocated to environmental protection measures, accounting for 0.38% of the total investment. (8) Land area: The total land area of the project is 63,333 m2. (9) Labor quota and working system: The project requires 60 workers, operating on a four-shift three-turn system with 8 hours per shift; there are 300 working days per year, resulting in 7,200 working hours annually. (10) Construction period: The project construction period is 12 months.
【Ten Years of Rapid Development in Chemical Processing Equipment】China’s first full-chain cryogenic treatment plant for natural gas successfully passed performance tests 3111-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719736 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Great Development in Chemical Equipment】 From 2016 to 2026, the largest domestic production line for 48K large-tow carbon fiber with a single-line capacity was completed and put into operation. The product performance has reached the international advanced level. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720044 (Source: Haichuan Chemical Forum (HCBBS))
【History of Haichuan Chemical Industry】The most comprehensive illustrated introduction——Jinxi Chemical Machinery Factory: The cradle of chemical machinery manufacturing in China https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719589 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Safety Management and Standardization of Special Equipment】On-site inspection of organic heat carrier boilers: Are you focusing on the right aspects? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720425 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Teahouse】During the meeting, you were questioned: “Why wasn’t it detected in advance?” ”, How should you, a person with high emotional intelligence, respond? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720574 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Haichuan Teahouse】Breaking rules occasionally is a beauty, but when it becomes habitual, it turns into a disaster. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720639 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2031 to 2026, the Luoyang Technology R&D Center developed an “exergy analysis” model technology for atmospheric and vacuum distillation units. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720568 (Source: Haichuan Chemical Industry Forum (HCBBS))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))