This post was last edited by zzhaichuan on 2015-8-22 08:50. The Machinery Section has introduced the \"Question of the Day\" feature, which not only helps to foster an active atmosphere for technical exchanges and guide the direction of such discussions but also provides users with financial rewards, enabling them to experience various cool features. After the pressure gauge passes the calibration, it should be marked with ( ) on it. A. Next verification date B. Current verification date C. Verification date. Answer: a. Refer to Section 8.4.2 of the Fixed Capacity Regulations. Please note: we will close this thread after 24 hours, and at that time we will announce the best response (the best assistance), along with the answer and explanation. Charisma Reward: If you post a topic in this section within two days to provide a detailed explanation or discussion of the knowledge points related to this question, please reply/comments in this post to let us know, and we will have a moderator award you charisma points. It is not allowed to simply copy and paste; original content is preferred, with at least some organization by the user along with personal insights. After registration, we will rank participants based on the content of their posts: the last-place participant will receive +1 charm, the second-to-last +2 charm, and so on, with the highest score earning +5 charm. http://bbs.hcbbs.com/thread-1381938-1-1.html Earning wealth by inviting friends http://bbs.hcbbs.com/thread-1389240-1-1.html [Mechanical Section] Collection of essential knowledge 【Seeking manufacturer sponsorship】 (long-term campaign)
After the pressure gauge passes calibration, the calibration date (C. Calibration Date) should be indicated on it.
After the pressure gauge passes calibration, (B) should be indicated on it. A. Next verification date B. Current verification date C. Verification date
After the pressure gauge passes calibration, it should be marked with ( ). A. Next calibration date B. Current calibration date
After the pressure gauge passes calibration, it should be marked with ( ). A. Next calibration date B. Current calibration date C. Calibration date Answer: A. Article 8.4.2 of the 09 edition of the Fixed Capacity Regulations specifies this clearly.
After the pressure gauge passes calibration, it should be marked with (A) on it.
After the pressure gauge passes calibration, it should be marked with ( ). A. Next calibration date
B, A. The next verification date is the expiration date.)