Since the environmental impact assessment hasn’t been approved, is this still useful?

2015-10-15View Original

Thread Content

On September 28, the methanation unit of the Yili Xintian coal-to-natural gas project, with an annual production capacity of 2 billion cubic meters, which was EPC-general contracted by Hualu Technology, was fully handed over. The project is located in Yining City, Ili Region, Xinjiang. It received approval from the **National Development and Reform Commission in March 2013; its construction capacity is 2.04 billion cubic meters per year, and the products produced will be fed into PetroChina’s West-East Gas Pipeline. http://www.nmtech.com.cn/*nwen_mhg_xx.asp?id=172347
Reply #22015-10-15
As the contracting party, one can’t just keep the issue on hold due to environmental assessment problems! Hehe
Reply #32015-10-15
I heard that the project is now basically ready for operation.
Reply #42015-10-16
It’s very difficult these days to find projects that are built first and then get approval! **Strict control is necessary!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.