Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. When establishing the material consumption quotas for standard brick masonry, the amount of bricks required should be determined based on ( ). A. Net usage amount B. Net usage amount plus loss amount C. Initial loss amount D. Loss amount plus amount to make up for losses 【Production and Management Division】Seeking moderators and technical discussants to join
Reply #22015-11-03
When establishing the material consumption quotas for standard brick masonry, the amount of bricks required should be determined based on (B). A. Net usage amount B. Net usage amount plus loss amount C. Initial loss amount D. Loss amount plus replacement amount
Reply #32015-11-03
When establishing the material consumption quota for standard brick masonry, the amount of bricks required should be determined as (B: net usage plus loss amount).
Reply #42015-11-03
When establishing the material consumption quotas for standard brick masonry, the amount of bricks required should be determined based on (A. net usage).
Reply #52015-11-03
When establishing the material consumption quotas for standard brick masonry, the amount of bricks required should be determined based on (B).
Reply #62015-11-03
When establishing the material consumption quotas for standard brick masonry, the amount of bricks required should be determined as (B: net usage plus loss amount).
Reply #72015-11-03
When establishing the material consumption quotas for standard brick masonry, the amount of bricks required should be determined as (B. net usage plus loss amount). Establishing material consumption standards mainly involves determining the net amount of materials used directly in the project, as well as the inevitable waste and losses that occur during transportation and handling at the construction site.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.