Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. Which of the following design plans for community boiler rooms is incorrect? ( ) A. On the inlet main pipe of the circulation pump in the hot water system, a pressure relief vent should be installed at a pressure higher than the static pressure of the system. B. The head of the make-up water pump should be no less than the pressure at the make-up water inlet plus a surplus of 35–50 kPa. C. The connection point between the high-level expansion tank and the hot water system should be located at the inlet main pipe of the circulation pump; the lowest level of the high-level expansion tank should be at least 1 meter above the highest point in the hot water system. D. There should be no fewer than 2 make-up water pumps, with one of them serving as a spare. 【Production and Management Division】We are seeking moderators and technical discussants to join us
Which of the following design plans for community boiler rooms is incorrect? (C) The location where the high-level expansion tank is connected to the hot water system should be at the inlet main of the circulation pump; the lowest level of the high-level expansion tank should be more than 1 meter above the highest point in the hot water system.)
Which of the following design plans for community boiler rooms is incorrect? (C) A. On the inlet main pipe of the circulation pump in the hot water system, a pressure relief vent should be installed at a pressure higher than the static pressure of the system. B. The head of the make-up water pump should be no less than the pressure at the make-up water inlet plus a surplus of 35–50 kPa. C. The connection point between the expansion tank and the hot water system should be located at the inlet main pipe of the circulation pump; the lowest level of the expansion tank should be at least 1 meter above the highest point in the hot water system. D. There should be no fewer than 2 make-up water pumps, with one of them serving as a backup
Which of the following design plans for community boiler rooms is incorrect? (C)
Which of the following design plans for community boiler rooms is incorrect? (C) Basis: Boiler Room Design Manual 4.1.3, 4.1.6, 4.1.12
C、-------------------------------------------------------------
C. The location where the high-level expansion tank is connected to the hot water system should be at the inlet main of the circulation pump. The lowest level of the high-level expansion tank should be more than 1 meter above the highest point in the hot water system
Which of the following design plans for community boiler rooms is incorrect? (C) A. On the inlet main pipe of the circulation pump in the hot water system, a pressure relief vent should be installed at a pressure higher than the static pressure of the system. B. The head of the make-up water pump should be no less than the pressure at the make-up water inlet plus a surplus of 35–50 kPa. C. The connection point between the expansion tank and the hot water system should be located at the inlet main pipe of the circulation pump; the lowest level of the expansion tank should be at least 1 meter above the highest point in the hot water system. D. There should be no fewer than 2 make-up water pumps, with one of them serving as a spare
Which of the following design plans for community boiler rooms is incorrect? (A) A. On the inlet main pipe of the circulation pump in the hot water system, a pressure relief vent should be installed at a pressure higher than the static pressure of the system. B. The head of the make-up water pump should be no less than the pressure at the make-up water inlet plus a surplus of 35–50 kPa. C. The connection point between the expansion tank and the hot water system should be located at the inlet main pipe of the circulation pump; the lowest level of the expansion tank should be at least 1 meter above the highest point in the hot water system. D. There should be no fewer than 2 make-up water pumps, with one of them serving as a spare