【Daily Question】Question from Issue 20151109

2015-11-09View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. Which of the following design plans for community boiler rooms is incorrect? ( ) A. On the inlet main pipe of the circulation pump in the hot water system, a pressure relief vent should be installed at a pressure higher than the static pressure of the system. B. The head of the make-up water pump should be no less than the pressure at the make-up water inlet plus a surplus of 35–50 kPa. C. The connection point between the high-level expansion tank and the hot water system should be located at the inlet main pipe of the circulation pump; the lowest level of the high-level expansion tank should be at least 1 meter above the highest point in the hot water system. D. There should be no fewer than 2 make-up water pumps, with one of them serving as a spare. 【Production and Management Division】We are seeking moderators and technical discussants to join us
Reply #22015-11-09
Which of the following design plans for community boiler rooms is incorrect? (C) The location where the high-level expansion tank is connected to the hot water system should be at the inlet main of the circulation pump; the lowest level of the high-level expansion tank should be more than 1 meter above the highest point in the hot water system.)
Reply #32015-11-09
Which of the following design plans for community boiler rooms is incorrect? (C) A. On the inlet main pipe of the circulation pump in the hot water system, a pressure relief vent should be installed at a pressure higher than the static pressure of the system. B. The head of the make-up water pump should be no less than the pressure at the make-up water inlet plus a surplus of 35–50 kPa. C. The connection point between the expansion tank and the hot water system should be located at the inlet main pipe of the circulation pump; the lowest level of the expansion tank should be at least 1 meter above the highest point in the hot water system. D. There should be no fewer than 2 make-up water pumps, with one of them serving as a backup
Reply #42015-11-09
Which of the following design plans for community boiler rooms is incorrect? (C)
Reply #52015-11-09
Which of the following design plans for community boiler rooms is incorrect? (C) Basis: Boiler Room Design Manual 4.1.3, 4.1.6, 4.1.12
Reply #62015-11-09
C、-------------------------------------------------------------
Reply #72015-11-09
C. The location where the high-level expansion tank is connected to the hot water system should be at the inlet main of the circulation pump. The lowest level of the high-level expansion tank should be more than 1 meter above the highest point in the hot water system
Reply #82015-11-09
Which of the following design plans for community boiler rooms is incorrect? (C) A. On the inlet main pipe of the circulation pump in the hot water system, a pressure relief vent should be installed at a pressure higher than the static pressure of the system. B. The head of the make-up water pump should be no less than the pressure at the make-up water inlet plus a surplus of 35–50 kPa. C. The connection point between the expansion tank and the hot water system should be located at the inlet main pipe of the circulation pump; the lowest level of the expansion tank should be at least 1 meter above the highest point in the hot water system. D. There should be no fewer than 2 make-up water pumps, with one of them serving as a spare
Reply #92015-11-09
Which of the following design plans for community boiler rooms is incorrect? (A) A. On the inlet main pipe of the circulation pump in the hot water system, a pressure relief vent should be installed at a pressure higher than the static pressure of the system. B. The head of the make-up water pump should be no less than the pressure at the make-up water inlet plus a surplus of 35–50 kPa. C. The connection point between the expansion tank and the hot water system should be located at the inlet main pipe of the circulation pump; the lowest level of the expansion tank should be at least 1 meter above the highest point in the hot water system. D. There should be no fewer than 2 make-up water pumps, with one of them serving as a spare

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.