HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The full-load performance test of the LNG facility in the methanation plant of Qinghua Xinjiang Group was a complete success

2015-11-20View Original

Thread Content

The full-load performance test of the LNG unit in the methanation workshop of Qinghua Xinjiang Group was a complete success. Author/Source: Date: 2015-11-20 Clicks: 3 Recently, the methanation workshop conducted a full-load performance test on the LNG unit. During the 72-hour test period, the unit operated smoothly with normal performance indicators and stable output, indicating that the full-load test of the LNG plant was a complete success. To ensure the smooth completion of the tests, the personnel on duty operated with care, while the inspectors were meticulous; any issues detected were reported promptly so that appropriate actions could be taken ; The on-duty supervisor promptly checks the data from the test sheets and processes it in a timely manner, ensuring that the LNG plant operates at 100% capacity smoothly, producing 207 tons of liquefied natural gas per day for sale to external markets. This performance test is the first test of the new LNG facility. Since it went into operational use on October 20, the unit has been operating at 50% load during the initial phase of commissioning; all equipment is functioning properly, and all process parameters meet the requirements specified in the product standards. Thereafter, the system gradually increased the load to 60%-70%, with all sections working closely together to ensure stable operation of the upstream sections as the LNG consumption increased, while also maintaining normal operating parameters for all mechanical and electrical equipment and ensuring that the process parameters met the specified standards. Finally, a full-load sprint was carried out; the system successfully increased its load to 100%, with the load reaching 110% at its maximum. All specifications were met, the system operated stably, and it fully satisfied the requirements of the full-load performance test. http://www.nmtech.com.cn/*nwen_mhg_xx.asp?id=173404
Reply #22015-11-20
I don’t know what the designed capacity of LNG for Xinjiang Qinghua is
Reply #32015-12-09
Intake air load of 30W/d.
Reply #42016-03-09
Intake air load of 30W/d. 207 tons of liquefied natural gas per day? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.