Thread Content
Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. When establishing the quota for the usage of construction machinery shifts, the following can be included in the quota time: ( ). A. Working hours when the machine operates at reduced load due to errors on the part of technical staff; B. Downtime caused by necessary maintenance during machine operation; C. Time wasted as a result of workers operating the machinery violating labor regulations; D. Downtime of the machinery caused by improper project organization. 【Haichuan Thanksgiving】--Production Division 【Production and Management Division】is seeking moderators and technical discussants to join us
B: Downtime caused by necessary maintenance during machine operation. 【Inevitable downtime refers to the interruptions related to the characteristics of the manufacturing process, the use and maintenance of machinery, and workers’ breaks; it is time that must be spent.】 】
When establishing the quota for the usage of construction machinery, the time that can be included in the quota is (B). A. Working time when the machine operates at reduced load due to errors on the part of the technical staff; B. Downtime caused by necessary maintenance during the use of the machine; C. Time wasted as a result of workers operating the machine violating labor regulations; D. Downtime of the machine caused by improper planning of construction activities
When establishing the quota for the usage of construction machinery, the time that can be included in the quota is (B). B. The working time during which the machine operates at a reduced load due to errors on the part of the technical staff; C. The downtime caused by necessary maintenance tasks while the machine is in use; D. The time during which the machine stops operating due to improper organization of construction work
B: Downtime caused by necessary maintenance during machine operation
B: Downtime caused by necessary maintenance during machine operation