How to deal with compressor vibration

2016-10-25View Original

Thread Content

I have a set of circulating hydrogen compressors of the PW.0.61-25-35 model; severe ground vibration occurs during operation, and all alignment measures taken meet the specified requirements. I request the help of all experienced teachers and experts, offering valuable solutions. Thank you
Reply #22016-10-25
Ground vibrations should be fine, right?
Reply #32016-10-25
Ground vibration may be a foundation-related issue; it is not necessarily caused by the compressor itself.
Reply #42016-10-26
On one hand, the foundation involves checking the tightness and levelness of the foot bolts; for the cooling water lines, flexible connections can be used, and measures such as 45-degree elbows or spring supports can be employed to mitigate the impact of pipeline fluids
Reply #52016-10-26
Look for the epicenter; it is recommended to use the process of elimination.
Reply #62016-10-28
The simplest solution is to install shock absorbers; there are shock absorbers available for purchase, and you can get in touch with them. For those with high requirements, damping shock absorbers can also be installed.
Reply #72016-10-28
Is the base a bit too small? We have encountered this problem before as well
Reply #82016-10-29
Thank you all for your replies. The design institute suggested reinforcing the foundation.
Reply #92016-10-29
It is likely that there are problems with the foundation aspects, such as uneven shims, foot bolts that are too short or not bent according to specifications, inadequate secondary grouting, insufficient foundation load, and so on. 1. Please have the architectural department of the design institute review the design ; 2. Check the handover documents to assess the status of the civil engineering foundation handover ; 3. Identify the causes on-site and take remedial actions accordingly.
Reply #102016-10-31
There are also many ways to reinforce it; didn’t the design institute provide a solution?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.