I vaguely remember that the auxiliary steam pipes of the boiler, **M**, can be inspected together with the boiler during its annual inspection. Which expert remembers in which standard this is specified? Thank you
Reply #22016-11-15
Units holding a pressure pipeline installation license may install pressure vessels or complete boilers connected to such pipelines simultaneously, with the installation supervision and inspection being carried out by a qualified inspection agency. When the total length of the connection pipes between the boiler and the heat-using equipment is 1000 meters or less, the boiler and its connected pipes can be installed simultaneously by a unit holding a boiler installation license, with installation supervision and inspection carried out by a qualified installation supervision agency; meanwhile, registration for use can be handled along with the boiler. When the total length of the pipelines exceeds 1,000 meters, the pipelines connected to the boiler must be installed by a unit holding a license for the installation of pressure pipelines, and separate registration for the use of those pressure pipelines must be obtained. . . . Are the above regulations true?~~ Where do they come from?
Reply #32016-11-15
Notice from the General Office of the Quality Inspection and Quarantine Administration on Issues Related to the Safety Supervision of Pressure Pipelines and Cylinders (AQSIQ Office Special [2015] No. 675) http://www.aqsiq.gov.cn/xxgk_13386/zxxxgk/201506/t20150624_443311.htm (VI) Regarding the installation of pressure pipelines. Units holding a pressure pipeline installation license may install pressure vessels or complete boilers connected to such pipelines simultaneously, with the installation supervision and inspection being carried out by a qualified inspection agency. When the total length of the connection pipes between the boiler and the heat-using equipment is 1000 meters or less, the boiler and its connected pipes can be installed simultaneously by a unit holding a boiler installation license, with installation supervision and inspection carried out by a qualified installation supervision agency; meanwhile, registration for use can be handled along with the boiler. When the total length of the pipelines exceeds 1,000 meters, the pipelines connected to the boiler must be installed by a unit holding a license for the installation of pressure pipelines, and separate registration for the use of those pressure pipelines must be obtained.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.