How should weld joint diagrams of type AB be drawn for containers lined with rubber?
Thread Content
As the title suggests, seeking help
Gasketing should be done after welding. The welding joint diagram is just drawn normally... that's it
I don’t understand. Gasketing shouldn’t affect drawing, right?
I meant the normal welding joint diagram shown in the picture; the customer requested a welding joint diagram with gasketing, so I added post-weld grinding and a gasket layer – I’m not sure if that’s correct
For joints, the same rules apply as to normal A\B class welds. Pay attention to ensuring that the inner welds are polished smoothly; for corner joints, it is necessary to round off the inner edges. There are generally two types of corners – recessed and protruding – and different design institutes have their own specifications, but in most cases the radius of curvature should be no less than 6 mm
For the joints, just like normal A\B class welds, the inner welds should be ground smooth; the detail drawing can show the thickness of the rubber lining after welding.