Thread Content
Last edited by Shutong on 2023-7-16 21:26 │ ├─17.2 Three Inspections and Four Fixes – General Information │ Complete documentation for the three inspections and four fixes of the 1.4 million tons per year continuous reforming–disproportionation unit and associated systems: 251 │ Responsibilities of the owner in the EPC model of supervision: 6 │ Checklists for HSE facilities under the three inspections and four fixes system: 3 │ Contents related to the three inspections and four fixes in petrochemical systems: 21 │ Guiding principles for the three inspections and four fixes: 10 pages.doc │ Inspection plans for the three inspections and four fixes: 3 │ Inspection plan 2 for the three inspections and four fixes │ Contact form for addressing issues identified during the three inspections and four fixes: 2 ├─17.2 Three Inspections and Four Fixes – General Information │ Complete documentation for the three inspections and four fixes of the 1.4 million tons per year continuous reforming–disproportionation unit and associated systems: 251.pdf │ Responsibilities of the owner in the EPC model of supervision: 6.pdf │ Checklists for HSE facilities under the three inspections and four fixes system: 3.pdf │ Contents related to the three inspections and four fixes in petrochemical systems: 21.pdf │ Guiding principles for the three inspections and four fixes: 10 pages.doc │ Inspection plans for the three inspections and four fixes: 3.pdf │ Inspection plan 2 for the three inspections and four fixes │ Contact form for addressing issues identified during the three inspections and four fixes: 2.pdf │ Summary of three inspections and four fixes for Heat Exchanger Stations No. 1 and No. 2: 03.04.xls │ Three inspections and four fixes 14.pdf │ Three inspections and four fixes 31.pdf │ Three inspections and four fixes 4.pdf │ Materials related to project management for the three inspections and four fixes: 17.pdf │ Knowledge related to the three inspections and four fixes: 32.pdf │ The three inspections and four fixes system versus the “Nine Completions and Five Deliveries” requirement: 1.pdf │ Comparison table for special inspections under the three inspections and four fixes system: 10.pdf │ Specific contents of the three inspections and four fixes: 17.pdf │ Specific contents of the three inspections and four fixes: 35.pdf │ Contents related to the three inspections and four fixes: 28.pdf │ Contents and requirements of the three inspections and four fixes: 12.pdf │ Contents related to the three inspections and four fixes (in petrochemical systems): 11.pdf │ Training materials on the three inspections and four fixes: 135 pages.doc │ Training textbooks for the three inspections and four fixes: 135.pdf │ Training textbooks for the three inspections and four fixes (including the most comprehensive checklists and standards): 134.pdf │ Detailed inspection rules for pipelines under the three inspections and four fixes system: 3.pdf │ Procedures and requirements for the three inspections and four fixes: 8.pdf │ Procedures, requirements, and checklists for the three inspections and four fixes: 5.pdf │ Management systems for the three inspections and four fixes: 23.pdf │ Management systems for the three inspections and four fixes: 39.pdf │ Regulations regarding the three inspections and four fixes system.pdf │ Checklists for the three inspections and four fixes: 3.pdf │ Checklists for the three inspections and four fixes (3 pages).doc │ Templates for checklists related to the three inspections and four fixes: 4.pdf │ Requirements for the three inspections and four fixes: 8.pdf │ Summary table of design flaws related to the three inspections and four fixes (for wastewater systems): 8.pdf │ Summary of issues identified during the three inspections and four fixes along with results of corrective actions: 13.pdf │ Specific contents of the three inspections and four fixes: 13.pdf │ PowerPoint presentation on the three inspections and four fixes for chemical projects: 69.pdf │ Law of the People’s Republic of China on Work Safety [Revised in 2021].doc │ Law of the People’s Republic of China on Data Security.doc │ Sinopec’s checklists for the three inspections and four fixes system: 1.pdf │ Checklists for instrument and electrical systems under the three inspections and four fixes system: 2.pdf │ Documentation on carrying out three inspections and four fixes throughout the entire process: 24 pages.doc │ Confirmation form for “three inspections and four fixes” of regenerative piston air compressors: 1.pdf │ List of safety checks before startup (PSSR): 14.pdf │ Guidelines issued by the State Administration for Work Safety regarding strengthening safety management in chemical processes.pdf │ Inspection standards for large ethylene production units under the three inspections and four fixes system: 16.pdf │ Summary of work related to safety aspects under the three inspections and four fixes system: 10.pdf │ Checklists for safety and fire protection systems under the three inspections and four fixes system: 1.pdf │ Report on the three inspections and four fixes system for Shandong Shengyun Chemical Co., Ltd.: 10.pdf │ Detailed rules for managing the three inspections and four fixes system in engineering projects: 8.pdf │ Acceptance criteria related to process pipelines under the three inspections and four fixes system: 12.pdf │ Detailed acceptance rules for process systems and equipment under the three inspections and four fixes system: 43.pdf │ Contents related to the three inspections and four fixes system in the atmospheric and vacuum distillation workshops: 46.pdf │ Main contents of the three inspections and four fixes system during the commissioning phase of new projects: 21.pdf │ Main contents of the three inspections and four fixes system during the commissioning phase of new projects: 22.pdf │ Should a new unit be flushed first or purged first? 2.pdf │ Inspection Form for “Three Inspections and Four Determinations” in a Certain Engineering Project, 1 page.doc │ Inspection Form for “Three Inspections and Four Determinations” in the Second Phase of the Fluorine Fine Chemicals Division Project 3.pdf │ Inspection Form for “Three Inspections and Four Determinations” of the Oil Refining Wastewater Recycling Unit in Refining Workshop 1.pdf │ Inspection Form for “Three Inspections and Four Determinations” in Production Preparation, 12 pages.doc │ Inspection Form for “Three Inspections and Four Determinations” in Production Areas and Tank Farms 3.pdf │ Contents of “Three Inspections and Four Determinations” in the Petrochemical System 24.pdf │ Contents of “Three Inspections and Four Determinations” in the Petrochemical System.doc │ “Three Inspections and Four Determinations” in Petrochemical Project Management 10.pdf │ List of “Three Inspections and Four Determinations” for Shenhua Ningmei Olefins Project; Rectification List for Air Separation Unit’s “Three Inspections and Four Determinations”.xls │ List of Problems Related to “Three Inspections and Four Determinations” in Desulfurization Units 7.pdf │ Reference Standards for “Three Inspections and Four Determinations” in the Equipment Field 51.pdf │ Reference Standards for “Three Inspections and Four Determinations” in the Equipment Field 41.pdf │ Procedures and Requirements for “Three Inspections and Four Determinations” in the Gas Generation Workshop 10.pdf │ Work Report on “Three Inspections and Four Determinations” for the Ordos Calcium Oxide Project 5.pdf │ Summary of Problems Related to “Three Inspections and Four Determinations” in the 35KV Acetic Acid Substation and Low-Voltage Transformers 3.pdf │ Steel Structure Demolition Plan 17.pdf │ Sample Construction Plan for Steel Structure Demolition 7.pdf │ Inspection Form for “Three Inspections and Four Determinations” of Static Equipment Heaters 2.pdf │ Inspection Form for “Three Inspections and Four Determinations” of Static Equipment Heat Exchangers 2.pdf │ Project Construction Control Procedures 8.pdf │ Project Management Models 15.pdf │ “Three Inspections and Four Determinations” in Project Management.doc │ ├─17.2 Papers on “Three Inspections and Four Determinations” │ └─Collection of Papers on “Three Inspections and Four Determinations”, Volume 1 │ _The Importance of “Three Inspections and Four Determinations” for Enterprise Automation Instrumentation Work_ by Wang Hongyu.caj │ On How to Carry Out “Three Inspections and Four Determinations” Effectively in Engineering Project Construction_ by Zhu Xueru.caj │ Thoughts on “Three Inspections and Four Determinations” for Large-Scale LNG Projects_ by Wang Jiefu.caj │ Analysis of Conducting “Three Inspections and Four Determinations” before the Handover of Chemical Plants_ by Wang Shoujian.caj │ Analysis of Conducting “Three Inspections and Four Determinations” before the Handover of Chemical Plants.pdf │ Problems and Countermeasures Related to “Three-Sided Projects” in Engineering Construction.pdf │ Problems Identified and Analyses During the “Three Inspections and Four Determinations” Stage for the Isomerization Units at Guangxi Petrochemical and Quanzhou Petrochemical.pdf │ Thorough “Three Inspections and Four Determinations” for the Units in the Yangzhuanghe Refining Project_ by Lu Xiaoyu.caj │ Reconsideration of “Three Inspections and Four Determinations” in Petroleum Engineering Construction Projects.pdf │ Reconsideration of “Three Inspections and Four Determinations” in Petroleum Engineering Construction Projects.pdf │ └─17.2 Courseware on “Three Inspections and Four Determinations”: Key Points of “Three Inspections and Four Determinations” and Intermediate Handovers PPT 20.pdf Key Points of “Three Inspections and Four Determinations” and Project Handovers 20 (2).ppt Key Points of “Three Inspections and Four Determinations” and Project Handovers 20.ppt “Nine Completions and Five Determinations” under “Three Inspections and Four Determinations” (including detailed explanations) PPT 36.pdf Introduction to “Three Inspections and Four Determinations” PPT 33.pdf Introduction to “Three Inspections and Four Determinations” PPT 33.pdf Introduction to “Three Inspections and Four Determinations” PPT 36.pdf Training on “Three Inspections and Four Determinations” – Equipment Section PPT 40.pdf Concept and Content of “Three Inspections and Four Determinations” PPT 58.pdf Study on “Three Inspections and Four Determinations” PPT 16.pdf Basic Knowledge Related to “Three Inspections and Four Determinations” PPT 51.pdf Project Management System Documents PPT 55.pdf Study on On-Site Inspection Standards for “Three Inspections and Four Determinations” (Steel Structures) PPT 49.pdf Key Points of On-Site Management, Construction, and “Three Inspections and Four Determinations” for Polypropylene Units PPT 35.pdf Illustrations of Typical Problems Related to “Three Inspections and Four Determinations” in Cathodic Protection PPT 10.pdf
It would be great to be able to share the content, but thanks anyway :)
Learning about the three inspections and four determinations in the chemical industry*
The requirements for the three checks and four determinations vary, and individual understandings of them also differ.
Is there no content? It’s useless to just send a list