English Translations
Forums
Submit Request
Main Site
Translations
»
English
»
【公用配套及基建圈】
7596
topics · Page 1/76
English
#3345001
Compilation of Gas Engineering Documents 23.18【Gas Engineering (Boilers, Turbines, Pipelines, Equipment, Transportation,
→
#3287261
Summary of project construction standards [steel structure standard specifications] list (no attachments) - HCBBS Forum
→
#5664604
Take a look at the “cutting-edge technology” on this device: 84 – The rust-removal robot - HCBBS Forum
→
#5698049
Hoisting of 45 silos of Tarim Phase II Ethylene Project is about to be completed - HCBBS Forum
→
#5703650
The main concrete structure of the flare emission system for Inner Mongolia Rongxin’s 400,000 tons per year polypropylen
→
#5704494
The first phase of Global Jilin Company’s Puixinjing specialty polyolefin materials project for new energy applications
→
#5703926
Tianjin Octanol Optimization and Safety Improvement Project: 35KV substation powered on successfully - HCBBS Forum
→
#5704831
The framework for the substation equipment in Xinjiang Guoye New Materials Technology Co., Ltd.’s 60,000 tons per year p
→
#5704486
[Haichuan Overseas Engineering] The compression building for the ammonia synthesis unit in the PUSRI-IIIB project in Pal
→
#5707666
The lifting work of the steel structure columns for the J1 pipe gallery in the Shandong Ruilin engineering project has b
→
#5704108
The China Coal Yulin Coal Deep Processing Base completed the centralized lifting of key equipment - HCBBS Forum
→
#5706012
Diameter change in the inlet and outlet pipelines of the centrifugal pump - HCBBS Forum
→
#5703103
The Shenhua Baotou methanol synthesis plant project has successfully lifted a giant precast frame column - HCBBS Forum
→
#5704806
[Haichuan Overseas Engineering] 100,000 tons/year high-purity silicon-based materials project in Oman - HCBBS Forum
→
#5703637
The lifting of the xylene column in the technical upgrade of Dagang Petrochemical’s continuous reforming unit was comple
→
#5719449
【Haichuan Illustrated Chemical Equipment】 Series Posts -- Fully Automatic Direct-Through Backwash Dirt Remover - HCBBS F
→
#690679
What is the difference in the number of turns of windings between explosion-proof motors and ordinary motors? - HCBBS Fo
→
#5703604
[Haichuan Overseas Engineering] Nigeria PLF-LNG Project - HCBBS Forum
→
#5703510
Baking of the coking plant at the Pingxiang Xuyang project site has begun - HCBBS Forum
→
#5704711
The installation work for the China Coal Yulin polypropylene plant project has been fully launched - HCBBS Forum
→
#5719562
【Haichuan Chemical Construction Technology】What aspects are checked during foundation pit inspection? - HCBBS Forum
→
#5704557
Meeting held to prepare for the commencement of China Nuclear Ke Youqian Banner’s integrated demonstration project for w
→
#5703455
The assembly of 14 recondensation reactors and air-cooled equipment for the stripping tower in the 300,000 tons per year
→
#5704394
Completion of the first phase of the Zhongke Kelan Wuhai PDA project - HCBBS Forum
→
#5703612
[Haichuan Overseas Engineering] China’s largest-ever Middle East submarine pipeline installation project – Qatar RUYA EP
→
#5704712
The substation for Fushun Petrochemical’s solution-process polyethylene project at Global Daqing Company has reached its
→
#5702797
【Haichuan EPC】The vague boundaries and key differences between project changes and design refinement in EPC projects - H
→
#5706623
The cabinet room in the dock area of the Blue Sea New Materials project has been successfully completed - HCBBS Forum
→
#864850
Should sewage pumps be powered by dual power sources? - HCBBS Forum
→
#5721814
Total storage capacity of the tanks in the atmospheric-pressure storage tank area for flammable liquids, and requirement
→
#5703614
[Haichuan Overseas Engineering] CNPC Engineering wins contract for $294 million Iraq gas pipeline project - HCBBS Forum
→
#5706025
【Haichuan Chemical Construction Technology】What are measure rebar? - HCBBS Forum
→
#5703280
Fujian Baihong, the largest anhydride production facility in East China with a capacity of 150,000 tons per year, succes
→
#5706304
The 36,000-ton lithium battery materials project of Baijierui (Jingmen) New Materials Co., Ltd. has successfully passed
→
#5703248
[Haichuan Overseas Engineering] Construction of 4 8,800-cubic-meter and 2 1,700-cubic-meter spherical tanks in Angola ha
→
#5704235
Boyuan Chemical: Boiler No. 4 in Phase 2 of the Alxa natural soda project has been started up and is in operation - HCBB
→
#5719584
【Haichuan Building Review】Reviewing and examining drawings – an essential skill for those working in the construction in
→
#5702896
【Haichuan EPC】Technical expert project managers go through three major transformations to progress from excellence to ou
→
#5724803
【2026 Ground Flare】The core working principle of the ground flare and its differences from the high flare - HCBBS Forum
→
#5706057
【Haichuan Chemical Construction Technology】Construction requirements for structural columns and ring beams in filled wal
→
#5707442
[Haichuan Overseas Engineering] Major breakthrough in the Soyo project in Angola: High-pressure above-ground flare succe
→
#864658
What instrument is used to record DC current and DC voltage in real time? - HCBBS Forum
→
#5722479
【Haichuan Building Review】 SH/T 3017-2013 \"Code for Design of Petrochemical Production Buildings\": Why can’t factories
→
#5717525
90% of cases of cracking in mass concrete are due to ignoring this detail! - HCBBS Forum
→
#5719608
【Haichuan Chemical Construction Technology】Don’t you know the standard requirements for concrete curing time? - HCBBS Fo
→
#864717
Who has counted the standard documents related to electricity in our chemical (petroleum and petrochemical) industry? -
→
#5704956
The upper section of the shift gas scrubber tower for the second phase of the Liuhua Chemical Project in Jingyuan, Baiyi
→
#5707875
Successful initial power supply to the quenching substation for the **Feng dry quenching coke project in Wuhai, Inner Mo
→
#5708470
The first batch of motors for the sulfur recovery unit at Northern Huajin have successfully completed individual trial o
→
#5704559
The storage and transportation facility project in the Zhenhai Port Area of Ningbo-Zhoushan Port, specifically in Zhongn
→
#5708469
The power reception for the phenol/** unit’s substation in the Zhongsha Gulei PC&BPA combined plant project was successf
→
#5703450
The Sino-Saudi Ghulai tank farm project, which is under EPC general contracting by Nanjing Engineering, has reached mech
→
#5704285
[Haichuan Overseas Engineering] The primary circulating water pipeline for the CAA-1 project in Indonesia has been fully
→
#5720338
【In-depth Discussion on Modular Installation of HaiChuan】--Successful One-time Lifting of the Dehydration Tank Frame for
→
#5704751
The underground foundation construction for China National Petroleum Corporation’s first POE production facility – the 1
→
#5705031
The main structure of the first circulating water station for the auxiliary projects of Yulin Fine Chemicals has been su
→
#5704983
More than half of the progress has been achieved on the Fushun Petrochemical ethylene capacity expansion project! - HCBB
→
#5722498
【Haichuan Building Design Review】--Which enterprises need initial rainwater ponds? How to build an initial rainwater pon
→
#5704250
The accident tank for the concentrated water from the first-stage reverse osmosis system in the wastewater treatment fac
→
#5704765
【Haichuan Construction Technology】Points to Note for Reviewing Steel Structure Drawings - HCBBS Forum
→
#5702894
【Haichuan EPC】Understand the several “key clauses” in an EPC contract - HCBBS Forum
→
#5705435
[Haichuan Overseas Engineering] Primary lifting of core equipment for the European Chemical and Chemical Complex project
→
#5704302
The hoisting of the chimney for the cracking furnace in the ethylene plant of Tarim’s 1.2 million tons/year Phase II eth
→
#5704617
[Haichuan Overseas Engineering] The raw water tank for the Qassim project in Saudi Arabia has successfully passed the ac
→
#5707746
The water filling test for the high and low temperature molten salt tanks in the China Power Construction Toksun 100MW s
→
#5706782
The single test of the motor at the oil station of the compression unit in the ethylene plant of the 1.2 million tons pe
→
#5719451
【Haichuan Safety Discussion】Hidden Dangers Around Us – Why Can This Crane Only Be Used for Lifting at Noon? - HCBBS Foru
→
#5704357
The installation of the steel structure for the nozzle layer and water-bearing layer of the urea granulation tower in He
→
#5703599
【Haichuan Construction Technology】How to distinguish between the stress-bearing bars, distribution bars, stirrups, erect
→
#5704353
Jiangsu Jiasheng LNG Project’s 110KV substation has successfully reached the pinnacle of achievement - HCBBS Forum
→
#5711248
Portable dissolved oxygen analyzer - HCBBS Forum
→
#5704393
[Haichuan Construction Technology] Construction techniques and methods for anti-static raised flooring, as well as key p
→
#5703589
[Haichuan Overseas Engineering] Sinopec Engineering wins two awards for Phase 3 of Saudi Aramco’s Gas Pipeline Network (
→
#950303
What is the operating sequence of drop-out fuses? - HCBBS Forum
→
#5707744
The high and low temperature molten salt storage tanks for the 100,000-kilowatt solar thermal project in Fukang have bee
→
#5704350
Construction begins on Nippon Steel Group’s project for advanced and efficient carbon dioxide capture and utilization -
→
#5704982
108 kilometers of the first-phase main line of the Zhundong Coal-to-Natural Gas Pipeline, the country’s largest coal-to-
→
#864815
Does the power distribution room have to be attached to the exterior wall? - HCBBS Forum
→
#5704320
【Haichuan Construction Technology】What are the five inspection items for the main structure? - HCBBS Forum
→
#5707598
The civil engineering work for Yankuang Energy Rongxin Chemical’s 800,000-ton olefin project has been successfully compl
→
#5707638
The 1.2-kilometer-long buried pipeline of the 33,000 Nm³/h air separation unit in Phase II of Guangxi Hengyi has been fu
→
#5722739
【Haichuan Chemical Construction Technology】What are the requirements regarding the types of connections for rebar and th
→
#5706305
The tallest equipment in the plant area of the Hebei Guanyu project, the fractionation tower, was successfully hoisted i
→
#5719395
【Haichuan Chemical Construction Technology】Construction techniques for subgrade replacement treatment - HCBBS Forum
→
#5706595
Welding of the weld joints for the four main pipelines at the 100MW solar thermal project in Toksun, Xinjiang, carried o
→
#5703703
Mechanical completion of the C2 recovery unit for the Huajin AAME project - HCBBS Forum
→
#5704440
The steel structure modules of the olefin unit in the China Coal Yulin project were successfully lifted into place - HCB
→
#5706310
Successful lifting of the large air purifier for the Inner Mongolia Zhuozheng project - HCBBS Forum
→
#5705391
Completion of Gansu Zhan Ding’s project for producing 870 tons of high-end specialty chemicals per year - HCBBS Forum
→
#5704657
The acid gas removal unit, the core equipment of the Zhongyuan Dahua technological upgrade project, successfully complet
→
#5719558
How to construct concrete in 40-degree heat? This is the correct way to apply ash in the summer! - HCBBS Forum
→
#5704493
The 500,000 tons per year methanol-to-ethanol project at Yulin Kaiyue Coal Chemical has been successfully completed - HC
→
#5704354
The equipment for the Hebei Bohang engineering project has successfully entered the trial production phase - HCBBS Forum
→
#5719984
【Haichuan Chemical Construction Technology】What are the types of concrete shrinkage? What impact does it have on the str
→
#5706780
【Ten Years of Rapid Development in Chemical Engineering Equipment】The medium-pressure module of the world’s largest comp
→
#5707874
The main body of the second compressor for the hydrogen production facility in Inner Mongolia’s 3D project has been lift
→
#5703694
The 830-ton No. 1 propylene tower in Maoming Petrochemical’s upgrade project was accurately positioned - HCBBS Forum
→
#5705447
[Haichuan Overseas Engineering] OT3 crude oil processing unit at West Qurna-1 oil field in Iraq successfully commissione
→
#5704329
[Haichuan Construction Technology] How to Prepare and Manage Project Quality Management Plans - HCBBS Forum
→
#690535
Experience in selecting circuit breakers – How to choose between C characteristics and D characteristics? - HCBBS Forum
→
1
2
3
4
...
»
Forum · Machine Translations for Reference Only
Privacy Policy
·
Terms of Use
·
Contact Us