English Translations
Forums
Submit Request
Main Site
Translations
»
English
»
【行业动态】
10579
topics · Page 1/106
English
#5302091
A new integrated project for natural gas chemical and new materials worth 17 billion yuan is to be built in Changshou, C
→
#5717420
List of key chemical projects in Henan Province in 2026 announced - HCBBS Forum
→
#5709667
【Ten Years of Rapid Development in Chemical Equipment】Many breakthroughs achieved from 2025 to 2035! The first phase of
→
#5713197
The total investment exceeds 1.1 billion yuan! Environmental impact assessment announcement for the second phase of Shan
→
#5710238
[Haichuan Overseas Engineering] All four 8,800 cubic meter liquefied gas spherical tanks for the first phase of the Lobi
→
#5708960
9 modules installed in sequence: Major breakthrough achieved in the modular construction of the Blue Sea New Materials p
→
#5713590
Xinhan New Materials plans to invest a total of 2 billion yuan in the Nanjing Jiangbei New Materials Science Park to dev
→
#5710531
[Haichuan Overseas Engineering] Sinoma Construction successfully secured the EPC contract for Morocco’s OCP phosphate de
→
#5712065
The first batch of pressure testing packages for Guangxi Huayi Energy Chemical’s EVA project has successfully completed
→
#5719356
Construction of the general contracting project for supporting facilities of the Hefei (Lujiang) LNG emergency peak-shav
→
#5716425
The Shanxi Changqing Biotechnology Co., Ltd. project has a total investment of 203 million yuan and is capable of produc
→
#5705993
The framework of the polymerization unit, the core facility of Donghua Energy’s (Maoming) 10,000-ton carbon fiber projec
→
#5722798
[Haichuan Overseas Engineering] Kickoff ceremony for Egyptian phosphate fertilizer project held in Cairo - HCBBS Forum
→
#2945303
【Miscellaneous Notes 3】 - HCBBS Forum
→
#2957468
[Haichuan Chemical News] Xinjiang Wucaiwan has become a new chemical city - HCBBS Forum
→
#5722542
**The 2 billion cubic meters per year coal-to-natural gas project of Energy Group’s Zhundong facility has reached a key
→
#2878675
【Reward for Reply】Thank you, 2019 – peace and happiness - HCBBS Forum
→
#2777198
【Haichuan Chemical Salary News】Borealis LyondellBasel’s project worth over $10 billion to be established in Panjin - HCB
→
#5722714
The primary flash tank for the Phase II project of Wanhua Chengda was successfully hoisted into place - HCBBS Forum
→
#5720687
[Haichuan Overseas Engineering] Pipeline installation work for the Musandam LNG project in Oman has officially commenced
→
#5721682
Dongying Chengde Energy Co., Ltd.’s project to produce 300,000 tons per year of xylene, with a total investment of 650 m
→
#5724151
[Haichuan Illustrated Chemical Equipment] Auxiliary Systems in Thermal Power Plant Power Stations – Wet Electrostatic Pr
→
#5723947
TJ Green Hydrogen Energy (Shangdu County) Co., Ltd.: Tender for EPC general contracting of 30,000 tons/year hydrogen pro
→
#5724917
10.79 billion yuan in syndicated loan facilities approved! Xinye Group’s 2 billion cubic meter coal gas project in Zhund
→
#5723660
Beiyou Engineering has completed the digital delivery phase work for the Yan’an LNG project - HCBBS Forum
→
#5720241
【2026 Industry Updates】Overview of the latest progress in China’s SAF projects in 2026 – Wansheng’s municipal key projec
→
#5722730
[Haichuan Overseas Engineering] Nitrogen displacement work completed for 3 metering stations in the BMH metering station
→
#5720201
Inner Mongolia Benxing’s project involving a total investment of 285 million yuan for the green circular utilization of
→
#5724323
The lower column of the unloading arm of Yangzi Jiasheng LNG Terminal Project was successfully hoisted into place - HCBB
→
#5724009
The bare-cooling test of the air separation unit in the China Coal Yulin Coal Deep Processing Base project was successfu
→
#5722551
[Haichuan Overseas Engineering] Water system construction for the project in southeastern UAE has fully entered the inst
→
#5719753
Shenzhen Xinxing achieves balance in the production and sales of lithium hexafluorophosphate; trial production of boron
→
#5724544
The environmental impact assessment for Yonghe Co., Ltd.’s technical upgrade project, which aims to produce 44,000 tons
→
#5720391
Wushen Banner Coal-Based New Materials Industrial Park Project - HCBBS Forum
→
#5724675
Saiding Engineering signs EPC contract for key equipment in Shanxi coke oven gas project - HCBBS Forum
→
#5721966
Lutianhua’s innovation incubation platform has identified 4 pilot projects - HCBBS Forum
→
#5721797
First environmental impact assessment announcement for Yibin Tianyuan’s project producing 30,000 tons of high-density li
→
#5723246
The expansion and renovation project of Wushihua’s 1.5 million tons per year aromatic compounds production complex is pr
→
#5724684
Public Notice on Competitive Bidding for Settlement Monitoring of Dalian Petrochemical (Xizhongdao) Integrated Refining
→
#5722520
The carbonization production line of Donghua Energy’s carbon fiber project has entered the final stage of joint commissi
→
#5720318
Project of DFDF New Materials Co., Ltd.: Annual production of 36,000 tons of key materials for power lithium batteries -
→
#5722627
Shenzhen Xinxing’s boron trifluoride project has officially entered the stage of large-scale production - HCBBS Forum
→
#5722942
The hoisting phase for the water distribution tank in the primary brine purification process of the Gansu Juhua project
→
#5719704
“Project on “Integrated technology and equipment for high-temperature dust removal and selective catalytic reduction (SC
→
#5722170
The propane filling project at Huazhong Gas’s Suzhou production facility has been officially put into operation - HCBBS
→
#5725260
Important agreement signed for a new petrochemical integration project in Yan’an with a total investment of 80.29 billio
→
#5724321
The pressure testing of the high-pressure nitrogen pipeline for the Beifang Huajin pipe tunnel project was completed suc
→
#5722780
Gansu Lihong New Materials Technology Co., Ltd. Fluorine-containing Special Chemicals Production Project - HCBBS Forum
→
#5725161
The 3,200-ton crawler crane for the second phase of the Shaanxi Huajian Shaanxi Coal Yulin Chemical project has complete
→
#5724531
Approval of the environmental impact report for the “Shanghai Petrochemical Renewal, Transformation and Structural Adjus
→
#5722545
The power supply and reception in the distribution room of the raw material factory building for the Deyang Chuanfa Long
→
#5723175
95% of the civil engineering work for the world’s first industrial demonstration project for producing aromatics from 10
→
#5721040
Preparation of the Feasibility Study Report for Gansu Energy and Chemical Group’s Qingyang Green Coal-based Integrated –
→
#5724812
Review Meeting for the 60% Scale Model of the Air Separation Unit in Xinjiang Dongming Plastic Co., Ltd.’s 800,000 tons/
→
#5723294
Latest progress of large-scale coal chemical projects in Inner Mongolia - HCBBS Forum
→
#5724540
The main structural construction of the fire pump room and the full set of decoration and decoration work of the public
→
#5720317
Zhejiang Sanmei’s 10,000-ton fluoropolymer project enters the countdown to production start - HCBBS Forum
→
#5725321
The 8 reciprocating compressors in the Carbon Dioxide Recovery Project of Northern Huajin United Petrochemical have comp
→
#5722200
Completion of the technical upgrade project to increase Dongying Chemical’s annual production of 60,000 tons of electron
→
#5723600
Rubber anti-aging additive: N,N’-Diphenyl-p-phenylenediamine - HCBBS Forum
→
#5723748
Public announcement on the deep-cold nitrogen production facility project at Beihai Refining and Chemical Industry - HCB
→
#5723688
Construction of the ultra-low emission renovation project for the coking division of Ningxia Baofeng Energy Group has be
→
#5723171
The extraction tower (C820) for the resource recycling project at Shandong Binhua New Materials Co., Ltd. was successful
→
#5722327
Draft for Public Comment on Shi Lei New Energy’s Project to Produce 60,000 Tons of Lithium Hexafluorophosphate Per Year
→
#5721245
Overview of the 100,000-ton/year battery-grade lithium iron phosphate project by Inner Mongolia Xingfa Technology Co., L
→
#5723231
【In-depth Discussion on Modular Installation of Haichuan】The 400-ton No. 1 loop reactor in Ningxia Baofeng PP plant proj
→
#5723549
Successful primary power supply connection at the 10KV East Area demineralized water substation for the Rongsheng New Ma
→
#5724057
[Haichuan Overseas Engineering] Contract signed for the second phase of the Huatong electrolytic aluminum production lin
→
#5720240
【2026 Industry Updates】Overview of the latest progress in China’s SAF projects in 2026 — Pengyao Environmental Protectio
→
#5725705
【Overseas Projects】Successful first-time feeding of the first unit in Indonesia’s 3×1000,000 tons/year sulfur-based sulf
→
#5720125
The main construction works of Yitai Ili Energy Co., Ltd.’s 1 million tons per year coal-to-oil project are being carrie
→
#5723335
Foundation-laying ceremony for Zhejiang Daoyi Polymer’s annual 30,000-ton water-based polyurethane production project he
→
#5724365
Total investment of 300 million yuan! Environmental Impact Assessment Announcement for Project to Fill 1.2 Million Bottl
→
#5722720
Fujian Yaxin Electronic Materials Co., Ltd.’s project for annual production of 40,000 tons of electronic-grade hydrogen
→
#5720515
Acceptance of the 10,000 tons/year PVDF technical renovation project at Huoja Industrial Co., Ltd. in Changzhi City - HC
→
#5719694
Shanghai LNG Comprehensive Utilization and Distribution Project with a total investment of 1.04 billion yuan - HCBBS For
→
#5722357
The primary power supply to the 35kV substation of the air separation unit in Yitai Ili Energy’s 1 million tons per year
→
#5720394
Zhejiang Xinhua Chemical Co., Ltd.’s new catalyst project - HCBBS Forum
→
#5719735
Concrete pouring for the raft foundation of the high-altitude granulation unit for compound fertilizers in the compound
→
#5720985
Bid for EPC general contracting of Phase 1 of the new energy solar thermal hydrogen production project by Zhongcai (Jund
→
#5723043
The lifting of the first unit of the wastewater treatment equipment for Phase 1 of Yulin Chemical Project Phase II was c
→
#5721385
Shaowu Yongtai High-Tech Materials Co., Ltd.’s project for the technical renovation and expansion of its production capa
→
#5720881
Hunan Haili Yongxing plans to invest 103 million yuan in a pilot project for fine chemical production - HCBBS Forum
→
#5722393
The 100,000-ton/year EVA project of Sinochem Quanzhou Petrochemical Co., Ltd. commenced operations in the Quanzhou Quanh
→
#5723038
Registration for Shaanxi Zhongxuan Lithium Energy Technology Co., Ltd.’s project to produce 10,000 tons per year of lith
→
#5724294
The trial production of the technical renovation project for Hongbaoli’s 160,000-ton/year propylene oxide plant is under
→
#5723734
Total investment of 50 billion yuan! The Wucaiwan New Plastic Coal Chemicals 2×1000,000-ton coal-to-olefins project in C
→
#5725115
Two major project milestones for the Zhoushan Jintang New Materials Integration Project have been successfully achieved
→
#5724936
The methanol distillation project for Phase 1 of the second phase of Shaanxi Coal Yulin Chemical has successfully comple
→
#5720345
【2026 Industry Insights】An Overview of American Chemical Companies in China – Eastman - HCBBS Forum
→
#5724370
3 million tons per year of clean and efficient comprehensive utilization of low-grade coal in the Santanghu Gobi area of
→
#5722410
Public Notice on the Environmental Protection Inspection upon Completion of Cangzhou Jinchijiamao New Materials’ 280,000
→
#5723778
Wuhai BDO industry moves toward clustered development - HCBBS Forum
→
#5723704
Submission for approval of the Environmental Impact Assessment Report for the Green Carbon Reduction Integrated Project
→
#5722024
Construction of Wenzhou Huagang LNG Gasification Unit Project Begins - HCBBS Forum
→
#5725159
A 4,000-ton crawler crane helped to successfully lift the 2# propylene distillation tower for the olefin separation unit
→
#5723954
Latest Progress on the Construction Project of Kangpeng Technology’s Fluorine-Based New Materials Production Base - HCBB
→
#5722140
Design work begins on Xinjiang Zhongtong Jirui’s 12 million tons/year coal valorization project for co-production of LNG
→
#5722133
106 cabinets in the cabinet room of Nantong Blue Sea New Materials’ FDPE plant have been installed in place - HCBBS Foru
→
#5720729
Lifting of the finished tower and light-end removal tower for the Xinjiang Zhongrong acetic acid project - HCBBS Forum
→
1
2
3
4
...
»
Forum · Machine Translations for Reference Only
Privacy Policy
·
Terms of Use
·
Contact Us