HCBBS Forum (Español)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Consulto a los grandes maestros, the difference between isometric drawings designed and isometric drawings constructed by the construction company.

2020-03-26View Original

Thread Content

Hecho el cambio de diseño a campo de trabajo, he not not the isometric drawings of the construction company area variety variety variety, and are completely different from the HGGG5 standard 19 norm. Please, please ask the isometric drawings submitted to the QA department of the construction company follow what standard? Please a request to the great masters for enlightenment.
Reply #22020-03-27
Debería marcar las dimensiones reales, los números de los operarios de soldadura, los números de soldadura,, y los soldadGes fijos y móviles, etc. Reuiere que se marquan sobre la base de los isometricos de la oficina de diseño. Pero en la práctica, muchas oficinas de diseño no dibujan, y laa la las la se dibujarar a sí mismos, de manera simple y concisa.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.