Regarding the boundaries between project pre-commissioning/commissioning/start-up

2018-11-04 View Original

Thread Content

What are the specific boundaries between the project’s construction phase and the pre-commissioning/commissioning/start-up phase? Please give me some advice. Thank you.
Reply #2 2018-11-04
Pre-commissioning should refer to pre-testing, which is part of the preparations before testing. For example: run the program in simulation first to check whether there are any bugs in the system. At the same time, verify that the machinery, electrical components, instruments, and pipelines have been installed correctly and are not loose or damaged in any way ; Check whether the entire system is ready for testing. Commissioning refers to testing; once the conditions for debugging are met, the system can be tested. During debugging, the system may either start up or shut down. The above represents my understanding of the project timeline; I hope it will be helpful to you.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.