Pressure pipelines are changed to the supervision and inspection process

2019-07-24View Original

Thread Content

For equipment upgrades, involving the addition of valves and changing the material of pipes on existing pipelines, is it necessary to first have the design institute issue a change order? And what should be done afterward?
Reply #22019-07-24
Is it to change the pipe material? If so, proceed with the renovation; the design institute will prepare the relevant renovation documents, and the construction party will be informed – no supervision or inspection is required
Reply #32019-07-24
To obtain the modification notification, GC1 and modifications with a length greater than 500m also require supervision inspections
Reply #42019-07-25
GC2 pipeline, originally carbon steel but modified to stainless steel, with a length of around 10 meters.
Reply #52019-07-25
Yes, it turns out carbon steel was changed to stainless steel

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.