HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Suspension process for PVC production

2020-07-03View Original

Thread Content

The suspension method PVC production process (BHC) used at Beijing Second Hospital has recently experienced frequent issues: out of 6 batches of material fed into the process, 1 batch turned out to be defective. Additionally, clogging of the spray valves occurred at the beginning of operation. Based on the above results, I would appreciate some guidance from the experienced experts in this forum. Why does this happen, and how can it be prevented or avoided?
Reply #22020-07-17
Check the monomer feed pump and the soft water flow meter to ensure accuracy. At the beginning of driving, you can use a slightly higher setting for the individual components; switch back to the normal setting once stability is achieved. Analyze Category A indicators to assess the quality of the soft water and the quality of the monomers. Check the dispersant pipeline for any leaks, and add a little more as appropriate
Reply #32020-07-20
Use the same agitator tank, or? Have the results come back yet?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.