20170525 Catalytic Cracking, Coking, and Reforming Edition 【One Question per Day】 Benefits Section

2017-05-25View Original

Thread Content

To thank all marine enthusiasts for their support of this section, we are launching a new round of activities as a way to give back to everyone. “\"One question per day, special offers section\" – this campaign will have posts published irregularly, 1-5 times per month. Please pay close attention to the \"Catalytic Cracking, Coking, and Reforming Edition\" page and follow me closely to avoid missing out on great opportunities to earn money: lol. Before participating in the campaign, please read the rules carefully: 1. A reward of 5 wealth points for participation, and 15 wealth points for correct answers ; 2. After answering, hide the ** – there will be a number following it; floors whose last digit matches this number will receive an additional 15 wealth points as a reward ; 3. Each person is allowed to reply only once; those who deliberately post repeatedly will be dealt with, you know what I mean:@ ; 4. The topics presented in this post are not subject to any restrictions ; 5. The validity period of this post is 96 hours; no rewards will be given after it expires ; 6. The owner of this post holds all rights to interpretation. Note: Going forward, ratings for this post will be given uniformly after 3 days! ! ! http://bbs.hcbbs.com/static/image/hrline/5.gif Fill-in-the-blank question: According to the \"Safety Specifications for Special Operations in Chemical Production Units\" GB30871-2014, earthwork operations refer to activities such as digging, piloting, drilling, trenching, and driving ground anchors at a depth of more than ( ) meters ; Operations such as filling soil or leveling the site using construction machinery like bulldozers and rollers, which may have an impact on underground utilities. Correct answer: 0.5 Lucky number: 5
Reply #22017-05-26
According to the \"Safety Specifications for Special Operations in Chemical Production Units\" GB30871-2014, earthwork operations refer to activities such as digging, piloting, drilling, trenching, and driving ground anchors at a depth of (0. 5) Over 5 meters ; Operations such as filling soil or leveling the site using construction machinery like bulldozers and rollers, which may have an impact on underground utilities.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.