HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

FCC raw feed riser issue

2017-06-20View Original

Thread Content

FCC (coaxial): During startup and shutdown, what is the amount of expansion/contraction of the raw oil riser? What impact will it have on the newly installed gate valve? I hope to receive guidance from all the teachers. Thank you!
Reply #22017-06-20
The check valve is equipped with expansion absorption, which automatically adjusts the valve position in response to the expansion/contraction of the riser
Reply #32017-06-21
Expansion can cause damage to the top of the plug valve, while contraction can result in the valve not closing properly. During each startup and heating process, it is necessary to keep records of the valve position and determine the final closed position of the valve.
Reply #42017-06-23
The expansion amount of the startup riser should be determined based on the regenerator temperature; our expansion amount is generally around 10 cm.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.