HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Reforming extraction distillation

2017-07-31View Original

Thread Content

Seek the method for putting an inserted reboiler into operation
Reply #22017-11-22
Establish the bottom liquid level (determine the operating control range based on the lowest liquid level that will submerge the tube bundle as specified in the design drawings), introduce steam to warm the tubes, and then start up the system by raising the temperature.
Reply #32017-11-23
This is consistent with the common general methods for reboilers; the key is to follow the principle of introducing the cold stream before the hot stream. In this case, the shell side of the plug-type heat exchanger functions as a tower. However, when using a plug-type reboiler, it is essential to raise the temperature slowly, with an increase of no more than 15°C per hour. Raising the temperature too quickly can easily damage the gasket at the head.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.