HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the reasons for poor cooling efficiency in the vent water tank of a delayed coking unit?

2017-08-26View Original

Thread Content

During the gas and water injection phase in the coking unit, the gas velocity is around 180 m/s; the oil at the bottom of the vent tower fails to cool down. What could be the reasons for this? The circulation volume is okay
Reply #22017-08-26
Reduce the temperature of the overhead circulation oil and appropriately increase the overhead circulation rate.
Reply #32017-08-26
Didn’t you install a return line for the vent tower?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.