HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Reformation and regeneration problems

2017-09-27View Original

Thread Content

I want to learn about regeneration, but I don’t know the specific procedures to follow after a thermal shutdown or a cold shutdown during regeneration, nor the key points to keep in mind or what to pay attention to first. I really don’t understand anything; could someone please send me some materials and summaries?
Reply #22017-09-28
Do you mean continuous reforming regeneration coking? The key is to control the regeneration temperature well to prevent it from rising too high. The control points are oxygen content and the heating furnace. Specifically, your company should have an operation manual.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.