Thread Content
The last edit to this post was made by 328104062 on 2018-1-13 at 15:02. As the title suggests, there are many evaluations, approvals, preliminary assessments, and specialized reports related to new petrochemical projects: those related to environmental protection, fire safety, safety facilities, occupational diseases, energy efficiency, seismic resistance, as well as cost estimates. If available, these include the environmental impact assessment report and the approval documents ; Report on the assessment of occupational disease hazards and approval ; Safety assessment report and review comments ; Energy conservation reports, review comments, etc.: 1. To which stage of project implementation do evaluation, approval, pre-evaluation, and special reports correspond respectively? How is the connection between the beginning and the end achieved? 2. Who is responsible for evaluation, approval, pre-evaluation, and the special report? Who gives the approval and who conducts the review? 3. For environmental protection, fire protection, safety facilities, occupational diseases, energy conservation, seismic resistance, and (estimated) costs – which of these require a preliminary assessment? Should the materials for such assessment be in the form of a separate document, an assessment report, or design drawings? 4. What are the requirements for preparing the evaluation reports and special sections on environmental protection, fire protection, safety facilities, occupational diseases, energy conservation, seismic resistance, and (estimated) costs? 5. In accordance with 033-2008, the sections on environmental protection, fire protection, safety facilities, occupational diseases, energy conservation, and seismic resistance (as part of the preliminary estimate) are to be included as part of the basic design for review by **relevant departments. Which departments are responsible for this review? What are the criteria for review? 6. What aspects are given emphasis to during the separate reviews of environmental protection, fire protection, safety facilities, occupational diseases, energy conservation, and seismic resistance (rough estimates)?
For environmental impact assessments, safety assessments, occupational health evaluations, etc., it is necessary to turn to testing agencies that possess the relevant qualifications. Preliminary safety assessments and safety assessments in general accompany the project throughout its various stages – from the project’s feasibility study and approval, through preliminary preparations, construction, to trial production – and it’s impossible to explain all of this in just a few words