HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Requirements for foam generators in the benzene storage area

2018-06-02View Original

Thread Content

In the benzene extraction unit of continuous reforming plants, benzene testing tanks are generally installed within the plant area; these tanks are equipped with breather valves, sampling ports, radar level gauges, differential pressure level gauges, foam generators, and safety discharge facilities. How do people usually manage foam generators?
Reply #22020-09-22
Is there a good solution? I’m also thinking about this issue

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.