Before starting the booster pump

2019-07-11View Original

Thread Content

Instrument inspection includes checking whether measuring, indicating, and control instruments are sensitive and accurate. Why is it not working?
Reply #22019-07-21
At the very least, the booster driven by heavy oil catalysis needs to undergo static testing; I’m not familiar with the other devices
Reply #32019-08-07
Static debugging mainly includes: electrical interlocks for the oil pump, automatic start-up of the auxiliary oil pump, various shutdown interlocks, as well as interlock protections that trigger a shutdown signal for the booster pump in response to changes in the process conditions
Reply #42019-08-21
Haha, got it. Checks and confirmations before testing

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.