HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Material of the gas phase line in the oil rejection tank of coking units

2021-06-03View Original

Thread Content

The vapor line of the oil stripping tank in our unit is used to handle the oil and gas pipelines associated with the coking process; it is made of carbon steel. Recently, severe corrosion and perforations occurred in this component, resulting in significant thinning of its walls. What material is used for the vapor lines of oil stripping tanks in other coking units?
Reply #22021-06-04
1. When the oil and gas enter the vent tower system at temperatures below 230°C, grade 20 steel should be used for the pipeline material; 2. When the oil and gas enter the distillation tower system at temperatures above 230°C, the pipeline material should be 12Cr5Mo ;
Reply #32021-06-04
Take a look at the design drawings; choose one made of chromium and molybdenum
Reply #42021-06-05
Ours are all made of carbon steel, and so far there have been no problems

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.