HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation of cut-off valves for the lean liquid lines in the dry gas desulfurization tower and the liquefied gas desulfurization tower

2024-08-21View Original

Thread Content

Is it necessary to install emergency shut-off valves on the lines that carry the lean liquid from the dry gas lean liquid pump and the liquefied gas lean liquid pump to the desulfurization tower?
Reply #22024-08-22
According to some previous materials, it should be installed; however, there is now a check valve in place
Reply #32024-09-27
There is no need to install a shut-off valve, but a check valve is present.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.