HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues related to preventing water leakage in factory buildings

2017-05-12View Original

Thread Content

Recently, two workshops in our factory have experienced leaks to varying degrees. How can we prevent this?
Reply #22017-05-19
The roof needs to be waterproofed. It’s still leaking from the side.
Reply #32018-03-30
Judgment is made based on the location of the leak, whether there are pipes or tanks in the vicinity, and whether cracks are present, after which appropriate measures are taken
Reply #42018-04-09
(What are you standing there for! Find a basin to catch it in! .....) Just kidding. However, if the roof isn’t properly waterproofed from the start, it will take a lot of effort to carry out waterproofing work again, and there’s a possibility that leaks will continue.
Reply #52018-04-17
This is hard to avoid; once it happens, the waterproofing has to be done over again

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.