A grade-3 station is planned to be built, and an overhead 10kV high-voltage line passes through one corner of the site. Is it still possible to construct a gas station in such a situation? (In the northwest corner of the site, high-voltage lines run in a northeast-southwest direction, at a distance of about 15 meters from the northwest corner of the red line.) It is planned to build a station building in the area where the high-voltage lines pass through in the northwest corner, with oil tanks and other equipment arranged at a safe distance from the high-voltage lines in accordance with regulatory requirements. I was wondering if this is feasible
Reply #22017-08-30
It may be unreasonable from a security perspective.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.