Steps to supply power to the high-voltage cabinet

2018-01-04View Original

Thread Content

10kv incoming cabinet, capacitor cabinet, busbar connection cabinet, transformer – what are the steps for powering them up, and what should be taken into consideration when powering each cabinet? Thank you, experts, for your answers
Reply #22018-01-04
It is required that the supplier’s technical staff must come to provide guidance
Reply #32018-01-07
I’m really a complete novice; I don’t even know how to reply! For high-voltage circuit breakers, there’s really nothing to worry about: the safety measures have been removed (no ground wires connected, no ground switches closed), and there are no foreign objects in the compartment, so it can be installed. In some cases, the secondary power supply is disconnected when installing the switch, but it’s not a big issue if it’s not done; the main thing is to get it in place, after which an inspection is needed

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.