The actual situation is this: we need to carry out construction at a worksite where the power distribution system in use is TN-S. Our electrical equipment includes the following: 20 welding machines, operating at 380V with a power consumption of approximately 10KW each; 2 plasma cutters, also operating at 380V with a power consumption of around 10KW each; 1 main motor for the roller bed, operating at 380V with a power rating of 16KW; 1 auxiliary motor for the roller bed, operating at 380V with a power rating of 5KW; 2 toothless saws, operating at 220V with a power consumption of 3KW each; 1 bench drill, operating at 220V with a power rating of 0.75KW; and 1 threading machine, also operating at 220V with a power rating of 0.75KW. What I’d like to know is how to configure our level-2 and level-3 distribution boxes. In other words, what should be the total capacity of the circuit breakers in the level-2 distribution box? Then, are there several empty spaces below for level-3 distribution boxes? How many Level 3 distribution boxes are needed? What size main circuit breaker should be selected for the incoming line of a Level 3 distribution box? How many leakage protection devices are there? What size residual current circuit breaker should I choose?
Reply #22018-04-12
The temporary electrical plan for construction is a task involving relatively high risks. Please have your unit’s electrical technicians design it, and then submit it to the chief engineer and project manager for approval.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.