In the \"surveying and setting out\" process for installing glass curtain walls, what should be verified first is ( ). A. The axis of the main structure B. Elevation control points C. The position of the columns D. The installation lines for the frame columns E. The cross-midline of the column anchorage points Answer: AB
Reply #22018-07-18
A. Main structure axis B. Elevation control point

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.