HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

May I ask, if a detailed survey was not conducted before the construction of a project, but one was carried out in an area nearby, can that survey be used?

2018-08-21View Original

Thread Content

If that’s not possible, and there is no detailed survey report available, can the construction drawings alone be used to go through the registration process at the local authorities before construction begins?
Reply #22018-08-21
Without a detailed survey report, it’s even impossible to obtain a Planning Permit.
Reply #32018-08-29
Previously, we did the same thing; it was quite difficult. However, it depends on whether the local authorities approve it.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.