HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Utilities – Water Supply and Drainage Section] 20181025

2018-10-25View Original

Thread Content

The design flow rate of the pipes for supplying water to the pipe network shall be determined according to () when there are no regulating structures in the network. a、Maximum daily supply volume at the peak time b、Average maximum daily supply volume at the peak time c、Maximum daily supply volume d、Average daily supply volume at the peak time plus self-use volume Answer: a
Reply #22018-10-25
a、Maximum daily supply volume at peak hours
Reply #32018-10-25
b、Average daily maximum water supply volume
Reply #42018-10-25
b、Average daily maximum water supply volume
Reply #52018-10-25
a、Maximum daily supply volume at peak hours
Reply #62018-10-25
a、Maximum daily supply volume at peak hours

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.